31
CH
C
P.
CH
P. Car.
DHW
Stemp.
ACC
Y4
1
2
3
4
1
2
3
1 2 3 4 5 6
Y3
Y2
12 11 10 9 8 7 6 5 4 3 2 1
0 1
2
3
45
6
7
8
9
9
8
10 11 12 13 14
2
1
3 4 5 6 7
Jp2
L
Instructions for the installer
Ares Tec connection 2 in battery controlled by Cascade Manager with Direct Zone plus Production of Domestic Hot Water.
SECONDARY LOOP
Note
For configuration of boiler cascade management para-
meters, see the specific installation manual
Note
For installation with a single boiler, the above connec-
tions will be made on the BCM board inside the boiler
Note
Example diagram, consider the total nominal flow rate,
any non-return valves (not supplied), moreover, the
efficiency of the flow switches must be checked at each
flow rate in modulation
Содержание ARES 150 TEC ERP
Страница 2: ......
Страница 3: ......
Страница 39: ...39 Instructions for the installer...
Страница 51: ...51...