25
1
2
3
4
5
6
7
A2
A1
A4
A3
Y2
Y1
Y3
GND
A5
1
2
1
2
3
M1
M2
A8
3
2
1
4
7
6
5
8
3
2
1
A7
4
5
6
A5
2
1
A6
2
1
1
2
3
4
5
6
7
8
9
10
11
12
1
2
3
4
5
6
7
8
Y1
1
2
3
4
A2
1
2
3
4
A3
A1
1
2
3
4
5
6
R
O
D
1
R
O
D
F1
A4
D
E
38
A8
3
2
1
4
7
6
5
8
3
2
1
A7
4
5
6
A5
2
1
A6
2
1
1
2
3
4
5
6
7
8
9
10
11
12
1
2
3
4
5
6
7
8
Y1
1
2
3
4
A2
1
2
3
4
A3
A1
1
2
3
4
5
6
R
O
D
1
R
O
D
F1
A4
44(1)
44(2)
F1
N PE L1
N PE L1
00330914
ATTENZIONE!
ATTENTION!
ACHTUNG!
ATENCIÓN!
ATTENTIE!
UPOZORNÌNÍ!
230 V
A8
3
2
1
4
7
6
5
8
3
2
1
A7
4
5
6
A5
2
1
A6
2
1
1
2
3
4
5
6
7
8
9
10
11
12
1
2
3
4
5
6
7
8
Y1
1
2
3
4
A2
1
2
3
4
A3
A1
1
2
3
4
5
6
R
O
D
1
R
O
D
F1
A4
00330914
ATTENZIONE!
ATTENTION!
ACHTUNG!
ATENCIÓN!
ATTENTIE!
UPOZORNÌNÍ!
230 V
Y4
1
2
3
4
1
2
3
1 2 3 4 5 6
Y3
Y2
12 11 10 9 8 7 6 5 4 3 2 1
0 1
2
3
45
6
7
8
9
9
8
10 11 12 13 14
2
1
3 4 5 6 7
Jp2
F1
44
TL
51
55
33
43
54
Selez.
Servizi di Riscaldament o
Seleziona la Funzione
Esci
52
Instructions for the installer
3.10 ELECTRICAL CONNECTIONS
Danger! Before setting up the connections or any
operation on the electrical parts, always cut-off the
electrical supply and make sure it cannot be acciden-
tally re-connected.
KEY
No.
Description
33
Temperature control HSCP
38
BMM
Burner management board
43
BCM
Boiler controller
44 (1)
F1
Power supply fuse 6.3 AF 250 V
44 (2)
F1
Board fuse BMM 6.3 AF 250 V
E
Power supply board
51
TLG
Manual resetting general limit thermostat (350 kW boilers)
52
M2
Additional terminal board +24V BCM
54
LTGL
TLG intervention light (350 kW boilers)
55
Boiler main switch
D
Wieland power plug 230V - 50Hz
Содержание ARES 150 TEC ERP
Страница 2: ......
Страница 3: ......
Страница 39: ...39 Instructions for the installer...
Страница 51: ...51...