20
B23P
-
C63
Instructions for the installer
3.6 FLUE EXHAUST PIPE CONNECTION
The flue exhaust pipe must comply with local and national regulations.
ATTENTION
For this type of connection, the room follows
the same installation regulations for boilers
with natural draught
Connection to a combustion product evacuation pipe outside the
room, the combustion air is taken directly from the room where
the device is installed.
HEAD AVAILABLE AT THE BASE OF THE CHIMNEY
S (Exhaust) A (Intake)
Dp = 100 Pa -
A (Intake)
The maximum permitted length of the pipes is determined by the
head (Dp) available at the base of the chimney.
ATTENTION:
for the
B23P
type of connection, the
room follows the same installation regulations for
boilers with natural draught.
The boiler is approved for the draining settings described below:
ATTENTION
To configure the
C63
you need to order the optional air
intake kit which includes instructions on application.
Separate ducts for combustion air intake and evacuation of combus-
tion products. (Commercial accessories)
HEAD AVAILABLE AT THE BASE OF THE CHIMNEY
S (Exhaust) A (Intake)
Dp = 100 Pa -
The maximum permitted length of the pipes is determined by the
head (Dp) available at the base of the chimney
ATTENTION:
The flue must comply with the standards in force
3.6.1 FLUE EXHAUST MANIFOLD
CONNECTION
To secure the flue exhaust manifold use the nuts and
washers contained in the bag.
The flue point must be positioned on the first straight
section, within 1 meter of the boiler.
To set up the flue inspection point, cut a Ø 21 mm hole
in the flue exhaust pipe, and install the inspection point
following the sequence provided.
Содержание ARES 150 TEC ERP
Страница 2: ......
Страница 3: ......
Страница 39: ...39 Instructions for the installer...
Страница 51: ...51...