27
WH
Y4
1
2
3
4
1
2
3
1 2 3 4 5 6
Y3
Y2
12 11 10 9 8 7 6 5 4 3 2 1
0 1
2
3
45
6
7
8
9
9
8
10 11 12 13 14
2
1
3 4 5 6 7
Jp2
R
+24V
BK
G
WH
Y4
1
2
3
4
1
2
3
1 2 3 4 5 6
Y3
Y2
12 11 10 9
8
7
6
5
4
3
2
1
0 1
2
3
4
5
6
7
8
9
9
8
10 11 12 13 14
2
1
3
4
5
6
7
Jp2
R
+24V
BK
G
FL
Instructions for the installer
Connection TA (*)
External probe connection
Safety devices
connection
(Y2 - 9 and terminal board M2) after removing
the jumper.
(*) Optional
INAIL safety connection
Remove the jumper and connect the cables, as indicated between
(Y2 11 and terminal board M2).
FL Flow switch connection (*)
Remove the jumper and connect the cables, as indicated between
(Y2 10 and terminal board M2).
Set up on the terminal board, BCM (
Y2 6-7
)
Содержание ARES 150 TEC ERP
Страница 2: ......
Страница 3: ......
Страница 39: ...39 Instructions for the installer...
Страница 51: ...51...