29
3-4
2
3
5
5
1
1
4
a
b
b
c
d
d
e
a
1
INS
TALLER
US
ER
MAINTEN
AN
CE TECHNI
CI
AN
3.17 CASING REMOVAL.
To facilitate boiler maintenance the casing can be
completely removed as follows (Fig. 3-4 / 3-5):
1 Undo the 2 bottom screws (b) that fasten the
protection guard (a).
2 Release the guard (a).
3 Unhook the decorative frame (c) from the
relative lower retainers.
4 Remove the decorative frame (c) from the cas-
ing (e).
5 Loosen the 2 front screws (d) that fasten the
casing.
6 Loosen the 2 lower screws (f) that fasten the
casing.
7 Pull the case towards you (e).
8 At the same time, push the case (e) upwards to
release it from the upper hooks.
Installation drawings key:
Unmistakeable component identification
Sequential identification of the operation to perform
Содержание 3.020928
Страница 1: ...MAIOR EOLO X 28 Instruction and recommendation booklet 1 038769ENG...
Страница 2: ......
Страница 30: ...30 3 5 6 6 7 8 8 f f e INSTALLER USER MAINTENANCE TECHNICIAN...
Страница 34: ......
Страница 35: ......