Device setup 

 

 

 

     2

Area of application  

 

 

     6

Safety instructions

   

 

 

      

6

Unpacking 

 

 

 

     6

Assembly  

 

 

 

     6

Commissioning 

 

 

 

     7

Maintenance and cleaning   

 

     7

Technical Data 

 

 

 

     7

Area of application

The 

IKA

®

 C 200.RC filling adapter supplies the C 200 calorimeter 

automatically and continuously with medium (water). 

With the RC 2 or KV 600 condenser, you have the option of pum-

ping water at a constant temperature into the tank of the C 200. 

Manually filling with medium at a constant temperature before the 

measurement is not required.

Unpacking

Unpacking

 

• 

Please unpack the device carefully. 

• 

In case of any damage, a detailed report must be sent im-
mediately (post, rail or forwarder).

Delivery scope

• 

C 200.RC filling adapter (quick plug couplings with level tube)

• 

Connection line, intake side with T-piece for the inner vessel 

drain 

• 

Connection line, pressure side with pressure control valve

• 

Hose anchoring (magnet)

Content

Assembly

• 

Remove the tank filler on the C 200.

• 

Press the C 200.RC filling adapter in the tank; the input/out-

put nipple shows the back of the device.

• 

Insert the connection line, intake side (Fig. 2, (10)) with the 

quick plug coupling (Fig. 2, (3)) onto the input nipple (Fig. 1, 

(2)). The coupling engages.

• 

Screw the other end of the connection line, intake side (Fig. 

2, (12)) hand-tight to the condenser connection ((IN), intake 

side). Shorten the hose, if necessary.

• 

Insert the connection line, pressure side (Fig. 2, (11)) with the 

quick plug coupling (Fig. 2, (5)) onto the input nipple (Fig. 1, 

(1)). The coupling engages.

• 

Screw the other end of the connection line, pressure side (Fig. 

2, (12)) hand-tight to the condenser connection ((OUT), pres-

sure side). Shorten the hose, if necessary.

• 

Insert the plastic coupling (Fig. 2, (7)) into the C 200 (Stan-

dard OUT).

• 

Secure the hoses in place using the supplied hose holder. The 

hose holder should be installed 30 mm from the edge of the 

housing, so that the hoses do not disrupt the area of the 

cover. To do this, remove the film from the adhesive side and 

secure the hose holder on top of the C 200. Insert the mag-

nets into the recess and secure the hoses.

        

Magnet

Hose anchoring

Please read the instruction manual of the conden-

ser and the C 200 calorimeter in full before use 

and follow the safety instructions.

• 

Keep the operating instructions in a place where they can be 

accessed by everyone.

• 

Ensure that only trained staff work with the appliance.

• 

Follow the safety instructions, guidelines, occupational health 

and safety and accident prevention regulations.

• 

Ensure that the connection lines are connected correctly..

• 

The condenser used (RC 2 or KV 600) must have an active 

intake side.

• 

Remove the device from the mains before assembly/disas-

sembly.

• 

Before use, check the hose system between the devices for 

leaks.

• 

Secure the hoses using the supplied hose anchoring (mag-

net). Do not bend the hoses

• 

Check hoses, tubes and bath at regular intervals for possible

        material fatigue (cracks/leaks).

Original language: German

30 mm

Содержание C 200.RC

Страница 1: ...he Information DE 4 Ursprungssprache Technical information EN 6 Information technique FR 8 Informaci n t cnica ES 10 Informacje techniczne PL 12 Informa o t cnica PT 14 RU 16 ZH 18 JA 20 KO 22 2000001...

Страница 2: ...a de salida 3 Salida del acoplamiento de enchufe r pido 4 Tubo de nivel vaciado de la caldera interna 5 Entrada del acoplamiento de enchufe r pido 6 Fijaci n de la manguera im n 7 Acoplamiento de pl s...

Страница 3: ...3 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 T 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12...

Страница 4: ...s Nehmen Sie bei Besch digungen sofort den Tatbestand auf Post Bahn oder Spedition Lieferumfang F lladapter C 200 RC Schnellsteckkupplungen mit Niveau rohr Anschlussleitung Saugseite mit T St ck f r d...

Страница 5: ...Uhrzeigersinn Kontrollieren Sie den F llstand sinkt dieser ist die Korrektur ausreichend steigt er weiter drehen Sie eine weitere Umdrehung Wiederholen Sie den Vorgang bis das Medium in der F llstands...

Страница 6: ...the connection line pressure side Fig 2 11 with the quick plug coupling Fig 2 5 onto the input nipple Fig 1 1 The coupling engages Screw the other end of the connection line pressure side Fig 2 12 han...

Страница 7: ...the pressure control valve by one turn counter clockwise Check the fill level if this falls the correction is sufficient if it continues to rise turn it by another turn Repeat the procedure until the...

Страница 8: ...nstat correspondant poste chemins de fer ou transporteur Contenu de la livraison Adaptateur de remplissage C 200 RC raccords rapides avec tube de niveau Cordon d alimentation c t aspiration avec racco...

Страница 9: ...e de la vanne de r gulation de pression d un tour dans le sens inverse des aiguilles d une montre Contr lez le niveau s il baisse la correction est suffisante s il continue augmenter tournez le capuch...

Страница 10: ...con cuidado Si observa desperfectos rellene de inmediato el registro cor respondiente correo ferrocarril o empresa de transportes Volumen de suministro Adaptador de llenado C 200 RC acoplamientos de...

Страница 11: ...ajuste de la v lvula de regulaci n de presi n una vuelta hacia la izquierda Revise el nivel de llenado si desciende significa que la Datos t cnicos Humedad presi n bar MPa 2 0 2 Medio Agua del grifo...

Страница 12: ...i o stanie faktycznym przewo nika poczta kolej lub spedycja Zakres dostawy Adapter do nape niania C 200 RC szybkoz czki ze rurka po ziomu Przew d przy czeniowy po stronie ssawnej z tr jnikiem do opr n...

Страница 13: ...a Je li spada korekta jest wystarczaj ca a je li nadal ro nie wykona kolejny obr t Czynno powtarza Dane techniczne Dopuszcz ci nienie bar MPa 2 0 2 rodki Woda wodoci gowa jako wody pitnej Zmiany techn...

Страница 14: ...do dispo sitivo Correios caminhos de ferro ou empresa transportado ra Material fornecido Adaptador de enchimento C 200 RC acoplamentos de en gate r pido com tubo de n vel Tubagem de liga o do lado de...

Страница 15: ...para esse efeito a tampa de ajuste na v lvula de regula o de press o uma volta no sentido dos ponteiros do rel gio Controle o n vel de enchimento se baixar a corre o suficiente se continuar a subir r...

Страница 16: ...16 RU C 200 RC 2 KV 600 Device setup 2 16 16 16 16 17 17 17 IKA C 200 RC C 200 C 200 RC 2 KV 600 C 200 RC c C 200 C 200 RC 2 3 2 10 1 2 2 12 IN 2 5 2 11 1 1 2 12 OUT 2 7 C 200 OUT 30 C 200 30 mm...

Страница 17: ...17 RC 2 KV 600 C 200 1 2 C 200 3 5 22 C IKA 2800 C 200 C 200 C 200 C 200 C 200 1 C 200 C 200 C 200 1 bar MPa 2 0 2 C IKA IKA IKA IKA www ika com 2...

Страница 18: ...18 Device setup 2 18 18 18 18 19 19 19 ZH C 200 RC 2 KV 600 IKA C 200 RC C 200 RC 2 KV 600 C 200 C 200 RC C200 C 200 RC 2 10 2 3 1 2 2 12 IN 2 11 2 5 1 1 2 11 OUT 2 7 C200 OUT 30 mm C 200 30 mm...

Страница 19: ...19 RC 2 KV 600 C 200 1 2 C 200 3 5 22 C IKA 2800rpm C 200 C 200 C 200 C 200 1 C 200 C 200 C 200 1 2 bar MPa 2 0 2 IKA IKA IKA IKA IKA www ika com...

Страница 20: ...20 JA C 200 RC 2 KV 600 Device setup 2 20 20 20 20 21 21 21 IKA C 200 RC C 200 RC 2 KV 600 C 200 C 200 RC T C 200 C 200 RC 2 10 2 3 1 2 2 12 IN 2 11 2 5 1 1 2 12 OUT 2 7 C 200 OUT 30 mm C 200 30 mm...

Страница 21: ...21 RC 2 KV 600 C 200 C 200 1 2 C 200 3 5 22 C IKA 2800 rpm C200 C 200 C 200 C 200 C 200 1 C 200 C 200 C 200 1 2 bar MPa 2 0 2 www ika com...

Страница 22: ...O C 200 RC 2 KV 600 Device setup 2 22 22 22 22 23 23 23 IKA C 200 RC C 200 medium RC 2 KV 600 C 200 medium C 200 RC T C 200 C 200 RC 2 3 2 10 1 2 2 12 IN 2 5 2 11 1 1 2 12 OUT 2 7 C 200 30 mm C 200 30...

Страница 23: ...23 RC 2 KV 600 C 200 1 2 C 200 3 5 22 C IKA 2800 rpm 200 C 200 C 200 C 200 C 200 medium 1 C 200 C 200 C 200 1 1 2 bar MPa 2 0 2 IKA IKA IKA IKA IKA IKA www ika com...

Страница 24: ...24 IKA Werke GmbH Co KG Janke Kunkel Str 10 D 79219 Staufen Tel 49 7633 831 0 Fax 49 7633 831 98 sales ika de www ika com 20010842a...

Отзывы: