13
Fig. 6-1
Fig. 6-2
d
d
h
• Do not install the unit in the immediate vicinity of a fill opening (fig� 6-3)� If
possible, install a fill pipe (A) in the tank (fig� 6-4)� Minimum distance between
the fill pipe and the rod = 50 mm; higher for probe lengths > 70 cm and in case
of heavy soiling�
Fig. 6-3
Fig. 6-4
50mm
A
To avoid incorrect measurements in case of heavy foam formation and
turbulence:
►
if possible, install the sensor in a steady area�
Example how to create a steady area:
-Installation in bypass or still pipe (see fig� 6-5)
-Separation of the installation location by metal sheets / perforated sheets
(without figure)