GB
2 - TECHNICAL INFORMATION
VIP80E
2 - Pag. 4 / 14
2.2
OPERATING CYCLE
Below are represented and
described the phases of the bar
feeder operating cycle.
- At the stop of the lathe
operating cycle, the bar pusher
(A) moves back to the limit stop
position.
- The bar pusher (A) and the "bar
drop control" unit (B) are lifted.
At the same time, also the bar
selecting unit (C) that loads the
first bar on the "bar drop
control" unit is lifted.
Содержание VIP80 Evolution
Страница 2: ......
Страница 4: ......
Страница 6: ......
Страница 35: ...4 HANDLING AND INSTALLATION VIP80E GB 4 Pag 7 21 ...
Страница 43: ...4 HANDLING AND INSTALLATION VIP80E GB 4 Pag 15 21 ...
Страница 50: ......
Страница 56: ......
Страница 70: ......
Страница 74: ...GB 7 BAR FEEDER MAINTENANCE VIP80E 7 Pag 4 5 Grease Grease ...
Страница 76: ......
Страница 84: ......