GB
4 - HANDLING AND INSTALLATION
VIP80E
4 - Pag. 4 / 21
4.5
BAR FEEDER INSTALLATION (without displacement)
WARNING - CAUTION:
installation and connections must be carried out according to the indications
provided by the manufacturer. The responsible person will also take into
account all regulative and law requirements, carrying out all the installations
and connections workmanlike. Once the installation has been completed, and
before the operating phases, he will check if the above-mentioned requirements
have been fulfilled.
The installation area must be in adequate environmental conditions (luminosity, ventilation,
etc.).
The floor must be steady and levelled in order to allow a correct bar feeder anchoring.
If necessary locate the exact position by drawing the coordinates.
4.6
INSTALLATION PHASES
Below are listed the installation steps. For further details see the relating sections.
Loading axis height variation (sect. 4.6.1)
Assembling the backing plates (sect. 4.6.2)
Magazine positioning (sect. 4.6.3)
Alignment and levelling (sect. 4.6.4)
Bar feeder fastening (sect. 4.6.5)
Содержание VIP80 Evolution
Страница 2: ......
Страница 4: ......
Страница 6: ......
Страница 35: ...4 HANDLING AND INSTALLATION VIP80E GB 4 Pag 7 21 ...
Страница 43: ...4 HANDLING AND INSTALLATION VIP80E GB 4 Pag 15 21 ...
Страница 50: ......
Страница 56: ......
Страница 70: ......
Страница 74: ...GB 7 BAR FEEDER MAINTENANCE VIP80E 7 Pag 4 5 Grease Grease ...
Страница 76: ......
Страница 84: ......