4 - HANDLING AND INSTALLATION
VIP80E
GB
4 - Pag. 13 / 21
4.8
INSTALLATION PHASES
Below are listed the installation steps. For further details see the relating sections.
Loading axis height variation (section 4.8.1)
Magazine positioning (section 4.8.2)
Alignment and levelling (section 4.8.3)
Bar feeder fastening (section 4.8.4)
4.8.1
Loading axis height variation
The bar feeder is generally supplied with the
loading axis height aligned to that of lathe
spindle. If you need to change it, proceed as
follows:
- Prepare the bar feeder to be lifted (sect. 4.4.).
- Stretch the ropes.
- Loosen, on both sides, the screws (B) and
remove the screws (A).
- Bring the bar feeder to the loading axis height
(see section 2.6. "Loading axis height" table).
- Refit the screws (A) and temporarily adjust
the screws. (B).
Содержание VIP80 Evolution
Страница 2: ......
Страница 4: ......
Страница 6: ......
Страница 35: ...4 HANDLING AND INSTALLATION VIP80E GB 4 Pag 7 21 ...
Страница 43: ...4 HANDLING AND INSTALLATION VIP80E GB 4 Pag 15 21 ...
Страница 50: ......
Страница 56: ......
Страница 70: ......
Страница 74: ...GB 7 BAR FEEDER MAINTENANCE VIP80E 7 Pag 4 5 Grease Grease ...
Страница 76: ......
Страница 84: ......