GB
4 - HANDLING AND INSTALLATION
VIP80E
4 - Pag. 2 / 21
4.1
PRELIMINARY NOTE ON MOTION AND INSTALLATION
IMPORTANT:
move and install the machine-tool by respecting the information provided by
the manufacturer, which are directly written on the package, bar feeder and in
the operation instructions. The person who is authorised to carry out these
operations shall prepare, if necessary, a "safety plan" to safeguard those who
are directly involved in them.
4.2
PACKAGING AND UNPACKAGING
A
NO PACKAGING
B
PACKAGING ON PALLET
C
PACKAGING IN CRATE
By reducing its dimensions, the packaging is made according to the type of transport required.
In order to make the transport easier, the shipping can be made with some disassembled
components being adequately protected and packaged.
Some parts, especially the electrical ones, are protected by anti-moisture nylon.
On the packaging all necessary information for loading and unloading are provided.
While unpacking, check the integrity and exact quantity of components.
The packaging material must be adequately disposed of in observance of the laws in force.
Содержание VIP80 Evolution
Страница 2: ......
Страница 4: ......
Страница 6: ......
Страница 35: ...4 HANDLING AND INSTALLATION VIP80E GB 4 Pag 7 21 ...
Страница 43: ...4 HANDLING AND INSTALLATION VIP80E GB 4 Pag 15 21 ...
Страница 50: ......
Страница 56: ......
Страница 70: ......
Страница 74: ...GB 7 BAR FEEDER MAINTENANCE VIP80E 7 Pag 4 5 Grease Grease ...
Страница 76: ......
Страница 84: ......