2
Installation and Servicing
ERP DATA
The code of practice for the installation,
commissioning & servicing of central
heating systems
WEEE DIRECTIVE 2012/19/EU
Waste Electrical and Electronic Equipment Directive
• At the end of the product life, dispose of the packaging
and product in a corresponding recycle centre.
• Do not dispose of the unit with the usual domestic refuse.
• Do not burn the product.
• Remove the batteries.
• Dispose of the batteries according to the local statutory
requirements and not with the usual domestic refuse.
MODEL
SYMBOL
UNITS
12 kW
15 kW
18 kW
24 kW
30 kW
Condensing Boiler
n/a
n/a
yes
yes
yes
yes
yes
Low Temperature Boiler
n/a
n/a
no
no
no
no
no
B1 Boiler
n/a
n/a
no
no
no
no
no
Cogeneration Space Heater
n/a
n/a
no
no
no
no
no
Equipped with a Supplementary Heater
n/a
n/a
no
no
no
no
no
Combination Heater
n/a
n/a
no
no
no
no
no
Nominal Heat Output for Space Heating
Full Load
P4
kW
12.1
15.1
18.1
24.3
30.3
Part Load
P1
kW
3.9
4.9
5.8
7.8
9.8
Auxiliary Electricity Consumption
Full Load
elmax
kW
0.016
0.022
0.025
0.046
0.050
Part Load
elmin
kW
0.011
0.017
0.004
0.013
0.012
Standby
PSB
kW
0.002
0.003
0.002
0.002
0.002
Seasonal Space Heating Energy
Efficiency
Full Load
ƞ4
%
90.0
90.0
89.8
90.0
89.6
Part Load
ƞ1
%
97.9
97.8
98.5
98.6
98.2
Standby Loss
Pstby
kW
0.05
0.05
0.05
0.05
0.05
Ignition
Pign
kW
0
0
0
0
0
Emissions NOx (Gross) NOx, pond Hs mg/kWh
10
21
24
28
24
Annual Energy Consumption
QHE
GJ
38
47
55
75
93
Sound Power Level, Indoors
LWA
dB
36
42
44
50
50
Содержание LOGIC HEAT2 H12
Страница 56: ...56 Installation and Servicing Section 6 Benchmark to Commissioning ...
Страница 62: ...62 Notes Installation and Servicing ...
Страница 63: ...63 Notes Installation and Servicing ...