45
Installation and Servicing
Section 3 - Servicing
SER
VICING
3.14 SPARK GENERATOR REPLACEMENT
1. Disconnect the leads from the spark generator.
2. Gently push up the generator to release the bottom clip
from the gas valve mounting bracket.
3. Lift the spark generator up and out of the bottom retaining
location point.
Refer to Section
3.2
4. Fit the new spark generator and re-assemble ensuring
that the the earth lead is replaced.
5. Check the operation of the boiler..
Refer to Section
2.33 & 2.34
3.15 GAS CONTROL VALVE REPLACEMENT
1. Unplug the electrical lead connection from the gas control
valve.
2. Remove the outlet gas valve clip and slide the pipe
upwards.
3. Undo the gas inlet pipe union at the inlet to the gas
valve.
4. Undo the two screws fixing the gas valve to the chassis
base and lift the gas valve upwards.
5. Fit the new gas control valve ensuring that the ‘O’ ring
and sealing washer are in place and reconnect gas and
electrical connections.
6. Ensure all gas valve connections are gas tight with a
gas soundness check up to the gas control valve.
Refer to Section
3.2
Refer to Section
2.33 & 2.34
2
4
Содержание LOGIC HEAT2 H12
Страница 56: ...56 Installation and Servicing Section 6 Benchmark to Commissioning ...
Страница 62: ...62 Notes Installation and Servicing ...
Страница 63: ...63 Notes Installation and Servicing ...