UA-5200 Series User Manual V4.3 ICP DAS
99
Step 4. Save Project
The setting of this example is finished now, and then to save the whole project and run
the project. So the last two steps will not show setting pages, but show some displays.
Click the next step
[Save Project],
the Step Box will show an animation as below
picture, that means the project is saving. When the animation vanished, the project is
saved completely.
Step 5. Run the Project
The project, after saving, needs to be executed. Click the next step
[Run the Project]
.
The Step Box will show the words
“
Please wait
” (as below), that means the system is
deleting the old project in the UA controller, and will upload the new project into the UA
series and run the new project. When the words
“
Please wait
” disappears, the new
words
“
Success
” appears (as below), that means the UA controller is running new
project successfully.
And then the Step Box will disappear automatically now, and back to the first screen
view of the Web UI.
The new project now completes the setting, uploading and running in the UA controller
and can process the new function project.
Содержание UA-5200 Series
Страница 13: ...UA 5200 Series User Manual V4 3 ICP DAS 13 1 5 Appearance UA 5231...
Страница 14: ...UA 5200 Series User Manual V4 3 ICP DAS 14 UA 5231M...
Страница 15: ...UA 5200 Series User Manual V4 3 ICP DAS 15 UA 5231M 3GWA 4GE 4GC...
Страница 225: ...UA 5200 Series User Manual V4 3 ICP DAS 225 The LINE APP messages received on the mobile phone...