Tape
Pulled
from
or
Broken
near
Leader
Pin
1
Loader
motor
worm
gear
6
Threader
mechanism
gear
2
Cartridge
loader
tray
guide
bearing
7
Lever
3
Rotator
stub
8
Loader
mechanism
gear
4
Threader
motor
worm
gear
9
Threader
worm
gear
5
Threader
intermediate
gear
__
Step
1.
From
the
left
side
of
the
drive,
pull
out
tape
from
the
take
up
reel.
Note:
If
there
is
more
than
approximately
0.6
m
(2
ft.)
of
tape
on
the
take
up
reel,
go
to
“Tape
Broken
in
Mid-tape”
on
page
101.
__
Step
2.
If
there
is
less
than
approximately
0.6
m
(2
ft.)
of
tape
on
the
take
up
reel,
cut
off
the
excess
tape
as
close
to
the
leader
pin,
as
possible.
__
Step
3.
Locate
the
threader
motor
worm
gear
(
4
in
Figure
32)
the
rear
of
the
drive.
You
can
either:
a.
Use
your
finger
to
rotate
the
threader
motor
worm
gear
and
slowly
rotate
the
threader
mechanism
gear
(
6
in
Figure
32)
clockwise;
or
b.
Use
a
#1
flathead
screwdriver
to
turn
the
threader
worm
gear
(
9
in
Figure
32)
clockwise.
This
rotates
the
threader
motor
worm
gear
(
4
in
Figure
32)
clockwise,
drawing
the
tape
leader
block
assembly
(LBA)
into
the
cartridge.
a82ru009
1
2
3
4
5
6
7
8
9
Figure
32.
Drive
with
cover
removed
to
reveal
gear
train.
Servicing
99
Содержание TotalStorage Ultrium T800
Страница 2: ......
Страница 8: ...vi IBM TotalStorage Ultrium Tape Drive...
Страница 10: ...viii IBM TotalStorage Ultrium Tape Drive...
Страница 14: ...xii IBM TotalStorage Ultrium Tape Drive...
Страница 16: ...xiv IBM TotalStorage Ultrium Tape Drive...
Страница 28: ...12 IBM TotalStorage Ultrium Tape Drive...
Страница 88: ...72 IBM TotalStorage Ultrium Tape Drive...
Страница 108: ...92 IBM TotalStorage Ultrium Tape Drive...
Страница 124: ...108 IBM TotalStorage Ultrium Tape Drive...
Страница 126: ...110 IBM TotalStorage Ultrium Tape Drive...
Страница 130: ...114 IBM TotalStorage Ultrium Tape Drive...
Страница 147: ......
Страница 148: ...Printed in USA GC26 7697 01...