2.
Position the rail at the correct height in the rack.
a.
Start from the front and align the pins (
1
in Figure 58 on page 63) on the front rail-locking
carrier with the holes on the rack mounting flange
2
.
b.
Release the rail-locking latch by pushing the smaller blue tab
3
away from the rail. The pins
spring into the closed position. Ensure that the pins go fully through the holes in the mounting
flange, as shown in Figure 58 on page 63.
c.
At the rear of the rack, align the pins on the rear rail-locking carrier with the holes on the rack
mounting flange.
Figure 57. An open rail-locking carrier at the rear of the support rail for the SAN Volume Controller 2145-8A4
62
IBM SAN Volume Controller Hardware Maintenance Guide
Содержание SAN Volume Controller
Страница 1: ...System Storage SAN Volume Controller Hardware Maintenance Guide Version 6 Release 1 GC27 2226 03...
Страница 2: ......
Страница 3: ...System Storage SAN Volume Controller Hardware Maintenance Guide Version 6 Release 1 GC27 2226 03...
Страница 14: ...xii IBM SAN Volume Controller Hardware Maintenance Guide...
Страница 22: ...xx IBM SAN Volume Controller Hardware Maintenance Guide...
Страница 26: ...xxiv IBM SAN Volume Controller Hardware Maintenance Guide...
Страница 316: ...290 IBM SAN Volume Controller Hardware Maintenance Guide...
Страница 322: ...Taiwan Class A compliance statement 296 IBM SAN Volume Controller Hardware Maintenance Guide...
Страница 324: ...298 IBM SAN Volume Controller Hardware Maintenance Guide...
Страница 326: ...300 IBM SAN Volume Controller Hardware Maintenance Guide...
Страница 332: ...306 IBM SAN Volume Controller Hardware Maintenance Guide...
Страница 333: ......
Страница 334: ...Part Number 31P1173 Printed in USA GC27 2226 03 1P P N 31P1173...