1
Assembly wing nuts
2
Wing nut
5.
Select the holes in the rail where you want to position the 2145 UPS-1U.
Note:
The bottom flange of the support rail must align with the EIA mark on the rack.
6.
Using two M6
×
10 screws (
1
in Figure 317) and two clip nuts
2
, attach the rail to the rear of the
rack. The customer's rack might be different than the one shown here, and if so, might require
different clip nuts or fasteners.
7.
Install two clip nuts (
2
and
3
in Figure 318 on page 283) to the front of the rack, then attach the
rail using just one M6 x 10 screw in the bottom mounting hole
1
.
Front
Rear
svc00033
2
1
Figure 316. Adjusting the rail depth on the 2145 UPS-1U
1
2
svc00034
Figure 317. Securing the rear rail on the 2145 UPS-1U
282
IBM SAN Volume Controller Hardware Maintenance Guide
Содержание SAN Volume Controller
Страница 1: ...System Storage SAN Volume Controller Hardware Maintenance Guide Version 6 Release 1 GC27 2226 03...
Страница 2: ......
Страница 3: ...System Storage SAN Volume Controller Hardware Maintenance Guide Version 6 Release 1 GC27 2226 03...
Страница 14: ...xii IBM SAN Volume Controller Hardware Maintenance Guide...
Страница 22: ...xx IBM SAN Volume Controller Hardware Maintenance Guide...
Страница 26: ...xxiv IBM SAN Volume Controller Hardware Maintenance Guide...
Страница 316: ...290 IBM SAN Volume Controller Hardware Maintenance Guide...
Страница 322: ...Taiwan Class A compliance statement 296 IBM SAN Volume Controller Hardware Maintenance Guide...
Страница 324: ...298 IBM SAN Volume Controller Hardware Maintenance Guide...
Страница 326: ...300 IBM SAN Volume Controller Hardware Maintenance Guide...
Страница 332: ...306 IBM SAN Volume Controller Hardware Maintenance Guide...
Страница 333: ......
Страница 334: ...Part Number 31P1173 Printed in USA GC27 2226 03 1P P N 31P1173...