3.
Align the two rear wheels on the node with the opening in the slides and then push the node into the
slides until the rear slide release latches (
2
in Figure 44) click into place, locking the node in the
slides.
4.
Reconnect the fibre-channel and Ethernet cables. Ensure that you replace the fibre-channel and
Ethernet cables in the same ports from which they were removed.
Figure 43. The captive thumbscrews that secure the node and the shipping brackets
svc00236
Figure 44. Aligning the SAN Volume Controller 2145-8G4 with the rack slides
Chapter 2. Removing and replacing parts
53
Содержание SAN Volume Controller
Страница 1: ...System Storage SAN Volume Controller Hardware Maintenance Guide Version 6 Release 1 GC27 2226 03...
Страница 2: ......
Страница 3: ...System Storage SAN Volume Controller Hardware Maintenance Guide Version 6 Release 1 GC27 2226 03...
Страница 14: ...xii IBM SAN Volume Controller Hardware Maintenance Guide...
Страница 22: ...xx IBM SAN Volume Controller Hardware Maintenance Guide...
Страница 26: ...xxiv IBM SAN Volume Controller Hardware Maintenance Guide...
Страница 316: ...290 IBM SAN Volume Controller Hardware Maintenance Guide...
Страница 322: ...Taiwan Class A compliance statement 296 IBM SAN Volume Controller Hardware Maintenance Guide...
Страница 324: ...298 IBM SAN Volume Controller Hardware Maintenance Guide...
Страница 326: ...300 IBM SAN Volume Controller Hardware Maintenance Guide...
Страница 332: ...306 IBM SAN Volume Controller Hardware Maintenance Guide...
Страница 333: ......
Страница 334: ...Part Number 31P1173 Printed in USA GC27 2226 03 1P P N 31P1173...