Push the blue button to allow the latch to slide forward. Then pull the slide rail
forward and pull the latch on the front of the rail in the U on the front of the
rack. Adjust the length of the rail.
5.
Install the front end of the slide rails, as shown in Figure 24.
Press the blue button to release the bracket. Push the front latch in all the way.
Make sure the latch is fully engaged.
6.
Install the other rail in the same manner.
Installing the cable-management arm for the SAN Volume
Controller 2145-CG8
The SAN Volume Controller 2145-CG8 uses a cable-management arm to route and
secure power and communication cables.
Figure 23. Preparing the front end of the slide rails
Figure 24. Installing the front end of the slide rails
Chapter 2. Installing the SAN Volume Controller 2145-CG8 hardware
29
Содержание SAN Volume Controller 2145-CG8
Страница 6: ...vi SAN Volume Controller Model 2145 CG8 Hardware Installation Guide...
Страница 8: ...viii SAN Volume Controller Model 2145 CG8 Hardware Installation Guide...
Страница 28: ...xxviii SAN Volume Controller Model 2145 CG8 Hardware Installation Guide...
Страница 34: ...6 SAN Volume Controller Model 2145 CG8 Hardware Installation Guide...
Страница 72: ...44 SAN Volume Controller Model 2145 CG8 Hardware Installation Guide...
Страница 99: ...Russia Electromagnetic Interference EMI Class A Statement Taiwan Class A compliance statement rusemi Notices 71...
Страница 100: ...72 SAN Volume Controller Model 2145 CG8 Hardware Installation Guide...
Страница 102: ...74 SAN Volume Controller Model 2145 CG8 Hardware Installation Guide...
Страница 104: ...76 SAN Volume Controller Model 2145 CG8 Hardware Installation Guide...
Страница 109: ......
Страница 110: ...Part Number 31P1669 Printed in USA GC27 3923 02 1P P N 31P1669...