The SP can dial a pre-programmed telephone number in the event of an IPL
failure. The SP issues an error report with the last reported IPL status indicated
and any other available error information.
Update Operator Panel
The SP displays Operator Panel data on the ASCII terminal if a remote
connection is active.
Environmental Monitoring
Environmental Monitoring is now controlled by the SP instead of the base
system, with expanded error recording and reporting.
System Firmware Surveillance (Heartbeat Monitoring)
The SP will monitor and time the interval between system firmware heartbeats.
Responding to System Processor Commands
The SP will respond to any command issued by the system processor.
Runtime Phase
This phase includes the tasks that the SP performs during steady-state execution of
the operating system.
Environmental Monitoring
The SP monitors voltages, temperatures and fan speeds (on some servers).
Responding to System Processor Commands
The SP will respond to any command issued by the system processor.
Run-Time Surveillance (Heartbeat Monitoring)
If the device driver is installed and surveillance enabled, the SP will monitor the
system heartbeat. If the heartbeat times out, the SP places an outgoing call.
This is different from the Bringup Phase scenario where two reboot attempts are
made before placing an outgoing call.
Appendix E. Service Processor Operational Phases
E-3
Содержание RS6000 - 7026 - H70
Страница 1: ...RS 6000 7025 F50 Series IBM Service Guide SA38 0541 01...
Страница 6: ...vi Service Guide...
Страница 14: ...xiv Service Guide...
Страница 16: ...xvi Service Guide...
Страница 18: ...Rear View 1 2 Service Guide...
Страница 23: ...Operator Panel Chapter 1 Reference Information 1 7...
Страница 24: ...System Data Flow 1 8 Service Guide...
Страница 120: ...AIX and Physical Location Code Reference Table 3 48 Service Guide...
Страница 121: ...Chapter 3 Error Code to FRU Index 3 49...
Страница 208: ...5 40 Service Guide...
Страница 211: ...Covers Removal 1 Open the door Chapter 6 Removal and Replacement Procedures 6 3...
Страница 217: ...b Remove the I O planar cover Chapter 6 Removal and Replacement Procedures 6 9...
Страница 222: ...5 Close the door 6 14 Service Guide...
Страница 231: ...4 Remove the screw holding the adapter Chapter 6 Removal and Replacement Procedures 6 23...
Страница 240: ...4 Remove the Processor card s as described in Processor Card on page 6 35 6 32 Service Guide...
Страница 247: ...Chapter 6 Removal and Replacement Procedures 6 39...
Страница 251: ...Replacement Replace in reverse order Chapter 6 Removal and Replacement Procedures 6 43...
Страница 255: ...Chapter 7 Parts Information Chapter 7 Parts Information 7 1...
Страница 256: ...7 2 Service Guide...
Страница 258: ...Note See IBM RS 6000 Diagnostic Information for Multiple Bus Systems for part numbers 7 4 Service Guide...
Страница 278: ...A 16 Service Guide...
Страница 318: ...C 4 Service Guide...
Страница 333: ...expect 8 r or 7 r or 6 r or 4 r or 3 r delay 2 done Appendix D Modem Configurations D 15...
Страница 340: ...D 22 Service Guide...
Страница 344: ...E 4 Service Guide...
Страница 353: ...VPD vital product data 3 93 Index X 9...
Страница 354: ...X 10 Service Guide...
Страница 356: ...X 12 Service Guide...
Страница 357: ......