Go to step 6 on page 87.
4.
To install an adapter in position 4, complete the following steps:
a.
Retract the retaining pin and slide the retaining door open to release the tail-stock as shown in
Figure 51 on page 83.
Figure 50. Inserting the position 1 and 3 riser
82
Power Systems: Installing the IBM Power System S822LC for Big Data (8001-22C)
Содержание Power Systems 8001-22C
Страница 1: ...Power Systems Installing the IBM Power System S822LC for Big Data 8001 22C IBM...
Страница 2: ......
Страница 3: ...Power Systems Installing the IBM Power System S822LC for Big Data 8001 22C IBM...
Страница 16: ...xiv Power Systems Installing the IBM Power System S822LC for Big Data 8001 22C...
Страница 136: ...120 Power Systems Installing the IBM Power System S822LC for Big Data 8001 22C...
Страница 137: ......
Страница 138: ...IBM Printed in USA...