Go to step 6 on page 87.
5.
To install an adapter in position 5, 6, 7, and 8, remove the riser as shown in Figure 53.
a.
Retract the retaining pin (A) so the arrow is pointing to the system.
Figure 52. Sliding the tail-stock retainer to the closed position
Figure 53. Removing the PCIe riser
84
Power Systems: Installing the IBM Power System S822LC for Big Data (8001-22C)
Содержание Power Systems 8001-22C
Страница 1: ...Power Systems Installing the IBM Power System S822LC for Big Data 8001 22C IBM...
Страница 2: ......
Страница 3: ...Power Systems Installing the IBM Power System S822LC for Big Data 8001 22C IBM...
Страница 16: ...xiv Power Systems Installing the IBM Power System S822LC for Big Data 8001 22C...
Страница 136: ...120 Power Systems Installing the IBM Power System S822LC for Big Data 8001 22C...
Страница 137: ......
Страница 138: ...IBM Printed in USA...