Before you begin
Power off the system and place it in the service position. For instructions, see “Preparing the 8001-22C or
8005-22N system to remove and replace internal parts” on page 92.
Procedure
1.
Attach the electrostatic discharge (ESD) wrist strap.
Attention:
v
Attach an electrostatic discharge (ESD) wrist strap to the front ESD jack, to the rear ESD jack, or to
an unpainted metal surface of your hardware to prevent the electrostatic discharge from damaging
your hardware.
v
When you use an ESD wrist strap, follow all electrical safety procedures. An ESD wrist strap is
used for static control. It does not increase or decrease your risk of receiving electric shock when
using or working on electrical equipment.
v
If you do not have an ESD wrist strap, just prior to removing the product from ESD packaging and
installing or replacing hardware, touch an unpainted metal surface of the system for a minimum of
5 seconds.
2.
Determine the slot in which you want to install the memory. See “Placement rules for memory in the
8001-12C or 8001-22C system” on page 22 to understand the plugging rules and to ensure that you
plug the memory into the system in the correct sequence.
3.
Depending on the memory locations, you might need to remove the system processor air baffle.
Carefully unsnap and lift the processor air baffle from the system.
4.
Push the DIMM locking tabs away from the socket.
5.
Insert the memory DIMM.
a.
Grasp the memory DIMM along its edges and align it with the slot on the system backplane.
Attention:
Memory is keyed to prevent it from being installed incorrectly. Note the location of
the key tab within the memory connector before you attempt to install it.
Figure 20. Removing the processor air baffle
24
Power Systems: Installing the IBM Power System S822LC for Big Data (8001-22C)
Содержание Power Systems 8001-22C
Страница 1: ...Power Systems Installing the IBM Power System S822LC for Big Data 8001 22C IBM...
Страница 2: ......
Страница 3: ...Power Systems Installing the IBM Power System S822LC for Big Data 8001 22C IBM...
Страница 16: ...xiv Power Systems Installing the IBM Power System S822LC for Big Data 8001 22C...
Страница 136: ...120 Power Systems Installing the IBM Power System S822LC for Big Data 8001 22C...
Страница 137: ......
Страница 138: ...IBM Printed in USA...