|
Appendix A. Discontinuing
|
This chapter describes the steps necessary to safely shut down and disconnect the Multiprise 3000 and
|
the Hardware Management Console.
|
Before starting this procedure, be certain you have the required tools, instructions, packing and
|
shipping materials for your particular system.
|
Packing and instructions for PCI Crypto cards
|
Obtain all needed materials before proceeding.
|
Attention
|
To safely power off the Multiprise 3000 and Hardware Management Consoles, all processing must be
|
completed. The steps necessary to complete CPC processing will depend on your operating system and
|
local procedures.
Be sure that processing is complete before deactivating the CPC(s).
|
All CPCs must be deactivated before power is removed. If you have a Hardware Management Console
|
that has all of your CPCs defined to it, you can deactivate all of your CPCs with a single deactivation by
|
deactivating the
Defined CPCs
group on that Hardware Management Console. If you do not have a
|
Hardware Management Console that has all of your CPCs defined to it, you will need to perform the
|
following steps on each of your Support Element(s):
|
Before Turning Off System Power
|
|
1 Performing Cryptographic Zeroize
|
From the Support Element Workplace panel.
|
1. Open
Task List
from the
Views
area
|
2. Open
CPC Configuration
from the
Task
|
List Work Area
|
3. Open
Groups
from the
Views
area.
|
4. Drag and drop the selected
CPC
onto the
|
Cryptographic Coprocessor
|
Configuration
in the
CPC Configuration
|
area.
|
5. Select a
CP
from the list of
CP's
|
6. Select
Zeroize
|
7. Select
Zeroize
|
8. Select
Ok
|
9. Repeat until all "CP"s have been zeroized.
|
10. Select
Cancel
to exit Cryptographic
|
Coprocessor Configuration.
Copyright IBM Corp. 1999, 2003
A-1
Содержание Multiprise 3000 S/390
Страница 1: ...S 390 Multiprise 3000 Enterprise Server R IBM Installation Manual SY24 6154 03...
Страница 2: ......
Страница 3: ...S 390 IBM Installation Manual SY24 6154 03...
Страница 8: ...vi Installing the System...
Страница 14: ...xii Installing the System...
Страница 34: ...1 20 Installing the System...
Страница 40: ...2 6 Installing the System...
Страница 78: ...5 20 Installing the System...
Страница 156: ...6 78 Installing the System...
Страница 160: ...7 4 Installing the System...
Страница 172: ...B 4 Installing the System...
Страница 173: ......
Страница 174: ...IBM Printed in the United States of America on recycled paper containing 10 recovered post consumer fiber SY24 6154 3...
Страница 175: ...Spine information IBM S 390 Installation Manual...