IBM 9006-12C Скачать руководство пользователя страница 107

v

When the rails are fully extended, the rail safety latches lock into place. This action prevents the
system from being pulled out too far.

Procedure

1.

Label and remove all cables from the rear of the system.

2.

Remove the front screws that secure the system to the rack from both sides of the system as shown in
Figure 91.

3.

Pull the system unit out of the rack.
CAUTION:

v

The chassis rails only extend about half of the distance of the chassis. Once the safety latches
are released, the chassis only slides forward a few inches before disengaging from the rails. Be
prepared to support the full weight of the chassis as you remove it from the slide rails.

v

The chassis contains most of the weight in the back side of the unit. When you remove the
system, take care to be ready to support the weight by grasping the chassis closer to the back of
the unit.

4.

Using two people, release the rail safety latches and remove the system from the rails. The safety
latches work in opposite directions; the latch on one side moves up while the latch on the other side
moves down.

5.

Carefully set the system on a table with an appropriate ESD surface.

Placing an 9006-12C system into the operating position

Learn how to place an IBM Power System LC921 (9006-12C) system into the operating position.

Figure 91. Removing the front screws and removing the system from the rack

Common procedures for servicing or installing features in the 9006-12C

91

Содержание 9006-12C

Страница 1: ...Power Systems Servicing the IBM Power System LC921 9006 12C IBM...

Страница 2: ......

Страница 3: ...Power Systems Servicing the IBM Power System LC921 9006 12C IBM...

Страница 4: ...y Notices manual G229 9054 and the IBM Environmental Notices and User Guide Z125 5823 This edition applies to IBM Power Systems servers that contain the POWER9 processor and to all associated models C...

Страница 5: ...the 9006 12C 55 Removing a system processor module from the 9006 12C system 55 Replacing a system processor module for the 9006 12C 61 Removing and replacing the time of day battery in the 9006 12C 69...

Страница 6: ...itional information 95 Drive installation details for the 9006 12C system 95 Notices 97 Accessibility features for IBM Power Systems servers 98 Privacy policy considerations 99 Trademarks 100 Electron...

Страница 7: ...dditional copies of safety information documentation can be obtained by calling the IBM Hotline at 1 800 300 8751 German safety information Das Produkt ist nicht f r den Einsatz an Bildschirmarbeitspl...

Страница 8: ...nect 1 Turn off everything unless instructed otherwise 2 For AC power remove the power cords from the outlets 3 For racks with a DC power distribution panel PDP turn off the circuit breakers located i...

Страница 9: ...mperatures will exceed the manufacturer s recommended ambient temperature for all your rack mounted devices v Do not install a unit in a rack where the air flow is compromised Ensure that air flow is...

Страница 10: ...e potential hazards v Verify that the route that you choose can support the weight of the loaded rack cabinet Refer to the documentation that comes with your rack cabinet for the weight of a loaded ra...

Страница 11: ...DANGER Rack mounted devices are not to be used as shelves or work spaces L002 L003 1 2 or 1 2 or 1 2 3 4 or Safety notices ix...

Страница 12: ...be equipped with multiple AC power cords or multiple DC power cables To remove all hazardous voltages disconnect all power cords and power cables L003 L007 CAUTION A hot surface nearby L007 L008 x Pow...

Страница 13: ...tacle Although shining light into one end and looking into the other end of a disconnected optical fiber to verify the continuity of optic fibers many not injure the eye this procedure is potentially...

Страница 14: ...rhanging load v Do not use on uneven surface incline or decline major ramps v Do not stack loads v Do not operate while under the influence of drugs or alcohol v Do not support ladder against LIFT TOO...

Страница 15: ...ing interfaces only Type 2 or Type 4 ports as described in GR 1089 CORE and require isolation from the exposed OSP cabling The addition of primary protectors is not sufficient protection to connect th...

Страница 16: ...xiv Power Systems Servicing the IBM Power System LC921 9006 12C...

Страница 17: ...contact the provider of the part or your next level of support DANGER When working on or around the system observe the following precautions Electrical voltage and current from power telephone and com...

Страница 18: ...ch the power cords to the outlets 5 For racks with a DC power distribution panel PDP restore the power from the Customer s DC power source and turn on the circuit breakers located in the PDP 6 Turn on...

Страница 19: ...to removing the product from ESD packaging and installing or replacing hardware touch an unpainted metal surface of the system for a minimum of 5 seconds If at any point in this service process you m...

Страница 20: ...in the previous step reinstall the drive in the bay you removed it from and check the other drive bays 6 Remove a drive from the tray v For a 3 5 inch drive unfasten the drive from the sides of the tr...

Страница 21: ...e retention spring A c Lift the 2 5 inch drive B out of the tray as shown in Figure 4 on page 6 d Close the retention spring e Turn the tray right side up Figure 2 Removing the 3 5 inch drive from the...

Страница 22: ...the electrostatic discharge ESD wrist strap on and that the ESD clip is plugged into a ground jack or connected to an unpainted metal surface If not do so now 2 Install a drive into the tray Orient th...

Страница 23: ...e 8 c Place the 2 5 inch drive A into the tray aligning the pins with the screw holes in the drive d When the pins are aligned close the retention spring allowing the pins to secure the drive in the t...

Страница 24: ...nt Ensure that the drive is fully seated and is all the way into the system 4 Lock the drive bay handle A by pushing in the handle release until it locks at B as shown in Figure 8 on page 9 Figure 7 M...

Страница 25: ...Hat Enterprise Linux RHEL version 7 2 To run the rescan command in the REHL version 7 2 operating system log in to the system as the root user and run the command rescan scsi bus sh a The rescan scsi...

Страница 26: ...ging your hardware v When you use an ESD wrist strap follow all electrical safety procedures An ESD wrist strap is used for static control It does not increase or decrease your risk of receiving elect...

Страница 27: ...ase or decrease your risk of receiving electric shock when using or working on electrical equipment v If you do not have an ESD wrist strap just prior to removing the product from ESD packaging and in...

Страница 28: ...ant to refer to Adding a Storage Device or Path https access redhat com documentation en US Red_Hat_Enterprise_Linux 7 html Storage_Administration_Guide logical unit add remove html 5 Load or restore...

Страница 29: ...aging and installing or replacing hardware touch an unpainted metal surface of the system for a minimum of 5 seconds If at any point in this service process you move away from the system it is importa...

Страница 30: ...Figure 13 on page 15 a Remove the two screws A one from each side from the top of the disk drive backplane b Pivot the top of the disk drive backplane towards the rear of the system to free the backp...

Страница 31: ...now 2 Remove the replacement disk drive backplane and cables from the protective plastic envelope 3 Move the cables from the old disk drive backplane to the new card 4 Replace the disk drive backplan...

Страница 32: ...on page 6 6 Using the labels replace the drive signal cables A and drive power cable B into the system backplane as shown in Figure 15 on page 17 Ensure that the cable latch clip snaps into place on t...

Страница 33: ...emove and replace internal parts on page 80 Removing and replacing fans in the 9006 12C Learn how to remove and replace the fans in the IBM Power System LC921 9006 12C system Removing a system fan fro...

Страница 34: ...electrical safety procedures An ESD wrist strap is used for static control It does not increase or decrease your risk of receiving electric shock when using or working on electrical equipment v If you...

Страница 35: ...ctor clip B and carefully pull up the connector A from the system backplane as shown in Figure 18 on page 20 Do not pull on the wires Feed the cable through the fan holder Figure 17 Removing a fan Rem...

Страница 36: ...ist strap on and that the ESD clip is plugged into a ground jack or connected to an unpainted metal surface If not do so now 2 With the fan holder lifted push the fan into the housing as shown in Figu...

Страница 37: ...of the chassis as shown in Figure 20 on page 22 For the fan holder near the cover switch temporarily move the cover switch wires out of the way When the fan holder is seated into the system replace th...

Страница 38: ...4 Connect the fan cable to the system backplane as shown in Figure 21 on page 23 Figure 20 Aligning the fan holder 22 Power Systems Servicing the IBM Power System LC921 9006 12C...

Страница 39: ...06 12C system Learn how to remove the graphics processing unit from the IBM Power System LC921 9006 12C system Before you begin Power off the system and place it in the service position For instructio...

Страница 40: ...system for a minimum of 5 seconds If at any point in this service process you move away from the system it is important to again discharge yourself by touching an unpainted metal surface for at least...

Страница 41: ...to replace a graphics processing unit in the IBM Power System LC921 9006 12C system Procedure 1 Ensure that you have the electrostatic discharge ESD wrist strap on and that the ESD clip is plugged in...

Страница 42: ...s shown in Figure 26 a Ensure that the PCIe holder release pins B are retracted so the arrows point into the system b Use the alignment pins A and slots to help you properly insert the riser cards and...

Страница 43: ...y in the 9006 12C Learn how to remove and replace memory in the IBM Power System LC921 9006 12C system Before you begin Power off the system and place it in the service position For instructions see P...

Страница 44: ...in this service process you move away from the system it is important to again discharge yourself by touching an unpainted metal surface for at least 5 seconds before you continue with the service pro...

Страница 45: ...is keyed to prevent it from being installed incorrectly Note the location of the key tab within the memory connector before you attempt to install it b Press firmly on each side of the memory DIMM unt...

Страница 46: ...lace it Insert the edge of the baffle into the fan support Then carefully press the baffle down into place Figure 30 Inserting the memory DIMM Figure 31 Installing the processor air baffle 30 Power Sy...

Страница 47: ...e to prevent the electrostatic discharge from damaging your hardware v When you use an ESD wrist strap follow all electrical safety procedures An ESD wrist strap is used for static control It does not...

Страница 48: ...shown in Figure 33 c Lift the PCIe adapter riser at points A and B from the system backplane 5 If the PCIe adapter to remove is in positions 2 3 or 4 you must remove the PCIe cage and riser a Remove...

Страница 49: ...m the adapter c If the riser contains a GPU remove the power cable A from the system backplane as shown in Figure 35 on page 34 Using your thumb press the release latch on the connector to remove the...

Страница 50: ...shown in Figure 36 a Remove the screw that secures the PCIe adapter to the PCIe cage b Remove the PCIe adapter from the riser Figure 35 Unplugging the GPU power cable Figure 36 Removing a PCIe adapte...

Страница 51: ...edure 1 Ensure that you have the electrostatic discharge ESD wrist strap on and that the ESD clip is plugged into a ground jack or connected to an unpainted metal surface If not do so now 2 Refer to t...

Страница 52: ...lstock to the PCIe adapter d Insert the adapter into the PCIe riser e If you installed the support bracket for the PCIe adapter fasten the special support tailstock to that bracket 4 If you are workin...

Страница 53: ...pter before inserting the adapter b Insert the adapter A into the riser B as shown in Figure 42 aligning it properly and inserting it fully into the slot Secure the adapter tail stock with 1 or 2 scre...

Страница 54: ...9 1 Ensure that the PCIe holder release pins B are retracted so the arrows point into the system 2 Use the alignment pins A and slots to help you properly insert the riser cards and replace the cover...

Страница 55: ...tic tip screwdriver to remove and replace the screws Removing the system backplane in the 9006 12C Learn how to remove the system backplane in the IBM Power System LC921 9006 12C system Before you beg...

Страница 56: ...c discharge ESD wrist strap to the front ESD jack to the rear ESD jack or to an unpainted metal surface of your hardware to prevent the electrostatic discharge from damaging your hardware v When you u...

Страница 57: ...label and remove the PCIe risers and adapters For instructions see Removing a PCIe adapter from the 9006 12C system on page 31 Remove the large PCIe riser first 7 Remove the 12 screws that support the...

Страница 58: ...ing the disk drive backplane from the 9006 12C on page 12 9 Remove the operator panel cable from the system backplane as shown in Figure 48 Figure 47 Processor socket screws on bottom of chassis Figur...

Страница 59: ...oving the front cables out of the way and carefully holding the processor heat sink move the system backplane slightly forwards and up to remove it See Figure 50 on page 44 Figure 49 Screw locations T...

Страница 60: ...l surface If not do so now 2 Remove the replacement system backplane from the static protective package and place it on an ESD mat The following steps move the system processor module from the old sys...

Страница 61: ...side down on a clean surface 6 Inspect the thermal interface material TIM for visible signs of damage If you see folds tears bends or if you have doubts about the TIM replace it Figure 51 Loosening he...

Страница 62: ...e from the old system backplane socket to transfer it to the new system backplane socket 10 Lower the tool and system processor module onto the socket Align the beveled corner A of the tool with the b...

Страница 63: ...uide pins are properly aligned squeeze and hold the two blue release tabs A together until a firm stop is reached as shown in Figure 55 on page 48 Then lift the tool off the system processor module Fi...

Страница 64: ...sink over the system processor module ensuring that the holes in the heat sink A align with the two guide pins B on the socket as shown in Figure 56 on page 49 Figure 55 Removing the system processor...

Страница 65: ...er the heat sink B and tighten the load arm screw with a 3 Phillips screw driver as shown in Figure 57 on page 50 Note Do not overtighten the load arm screw Figure 56 Installing the heat sink Removing...

Страница 66: ...Moving the front cables out of the way and carefully holding the processor heat sink lower the system backplane into the chassis then slide it slightly back See Figure 58 on page 51 Figure 57 Tighteni...

Страница 67: ...5 Align and screw the 14 screws into the system backplane The screw locations are shown in Figure 59 on page 52 Figure 58 Replacing the system backplane Removing and replacing parts in the 9006 12C 51...

Страница 68: ...Replacing the disk drive backplane in the 9006 12C on page 15 17 Replace the operator panel cable into the system backplane as shown in Figure 60 on page 53 Figure 59 Screw locations The two screws a...

Страница 69: ...sor sockets a Turn the system over upside down b Replace the 12 screws from the bottom The screw locations are shown in Figure 61 on page 54 c Turn the system over right side up Figure 60 Replacing th...

Страница 70: ...a system fan in the 9006 12C on page 20 21 Using your labels replace the memory DIMMs For instructions see Removing and replacing memory in the 9006 12C on page 27 22 Install the processor air baffle...

Страница 71: ...the electrostatic discharge ESD wrist strap The ESD wrist strap must be connected to an unpainted metal surface until the service procedure is completed and if applicable until the service access cov...

Страница 72: ...arm screw A of the system processor heat sink B that you are removing with a 3 Phillips screw driver The load arm pivots up in the direction that is shown in Figure 65 on page 57 Figure 63 Opening the...

Страница 73: ...6 Place the heat sink upside down on a clean surface 7 Inspect the system processor socket area and remove any dust or debris use a can of compressed air Figure 65 Loosening heat sink load arm screw F...

Страница 74: ...down on the tool to lock the system processor module into the tool as shown in Figure 68 on page 59 The tool drops slightly when you push down on the processor module so that the jaws can grab the bo...

Страница 75: ...e packaging as shown in Figure 69 on page 60 Setting the system processor module at an angle on the top cover of the system processor module packaging will make it easier to pick up and place in the p...

Страница 76: ...to release the system processor module from the tool as shown in Figure 70 on page 61 Figure 69 Placing the processor at an angle on the top cover of the packaging 60 Power Systems Servicing the IBM...

Страница 77: ...o a ground jack or connected to an unpainted metal surface If not do so now 2 Inspect the system processor socket area and remove any dust or debris use a can of compressed air 3 Remove the replacemen...

Страница 78: ...page 63 The tool drops slightly when you push down on the processor module so that the jaws can grab the bottom of the module Make sure that both of the tool jaws are locked on the system processor mo...

Страница 79: ...ove any dust or debris use a can of compressed air 6 Lift the system processor module from the packaging tray as shown in Figure 73 on page 64 Figure 72 Locking the system processor module into the to...

Страница 80: ...care to lower the tool evenly without tilting the tool Do not attempt to slide the tool and the system processor module in any direction while the system processor module is touching the socket If the...

Страница 81: ...rly aligned squeeze and hold the two blue release tabs A together until a firm stop is reached as shown in Figure 75 on page 66 Then lift the tool off the system processor module Figure 74 Installing...

Страница 82: ...sink Carefully lower the heat sink over the system processor module ensuring that the holes in the heat sink A align with the two guide pins B on the socket as shown in Figure 76 on page 67 Figure 75...

Страница 83: ...er the heat sink B and tighten the load arm screw with a 3 Phillips screw driver as shown in Figure 77 on page 68 Note Do not overtighten the load arm screw Figure 76 Installing the heat sink Removing...

Страница 84: ...tem processor module that you replaced by the edges and lift it off the shipping cover Align the beveled corner of the module A to the corner of the tray with the triangle B and place it in the tray a...

Страница 85: ...stem Before you begin Power off the system and place it in the service position For instructions see Preparing the 9006 12C system to remove and replace internal parts on page 78 Procedure 1 Attach th...

Страница 86: ...r at least 5 seconds before you continue with the service process 2 If the time of day battery is covered by a PCIe adapter move the adapter out of the way For instructions see Removing a PCIe adapter...

Страница 87: ...surface of your hardware to prevent the electrostatic discharge from damaging your hardware v When you use an ESD wrist strap follow all electrical safety procedures An ESD wrist strap is used for sta...

Страница 88: ...plugged in properly What to do next Prepare the system for operation For instructions see Preparing the 9006 12C system for operation after you remove and replace internal parts on page 80 Figure 82...

Страница 89: ...ower distribution panel PDP disconnect the customer s DC power source to the PDP v When connecting power to the product ensure all power cables are properly connected For racks with AC power connect a...

Страница 90: ...he rack cabinet v To avoid hazardous conditions due to uneven mechanical loading always install the heaviest devices in the bottom of the rack cabinet Always install servers and optional devices start...

Страница 91: ...t the new feature See IBM Prerequisite 2 If you are installing or replacing something that might put your data at risk ensure wherever possible that you have a current backup of your system or logical...

Страница 92: ...the following states Solid blue indicates that the local UID button was pressed Flashing blue indicates that a remote UID command was run Solid red indicates that the system is overheated Flashing re...

Страница 93: ...form Management Interface IPMI program to turn on the blue identify LED to help you find the IBM Power System LC921 9006 12C or IBM Power System LC922 9006 22C system that needs servicing Procedure Us...

Страница 94: ...ical safety procedures An ESD wrist strap is used for static control It does not increase or decrease your risk of receiving electric shock when using or working on electrical equipment v If you do no...

Страница 95: ...bles To remove all hazardous voltages disconnect all power cords and power cables L003 L005 CAUTION Hazardous energy present Voltages with hazardous energy might cause heating when shorted with metal...

Страница 96: ...s plugged into a ground jack or connected to an unpainted metal surface If not do so now 2 Replace the service access cover For instructions see Installing the service access cover on an 9006 12C syst...

Страница 97: ...tems About this task Attention For safety airflow purposes and thermal performance the service access cover must be installed and fully seated before you power on the system You can use this procedure...

Страница 98: ...pairs coming The P setting instructs the system to shut down and then power down The indicates the time in minutes before the shutdown occurs Drive commands for 9006 12C or 9006 22C Learn about the st...

Страница 99: ...p the file then for RHEL 1 Navigate to the linux ppc folder then to the Little Endian folder 2 Install the package by running this command where x xx x equals the version of the utility rpm ivh StorCL...

Страница 100: ...To turn the drive light on sas3ircu controller_ locate Enclosure Bay ON And off sas3ircu controller_ locate Enclosure Bay OFF To view additional help for the command sas3ircu help NVMe commands Learn...

Страница 101: ...ensor is determined based on the sensor status at time of invocation of the display The sensor display maintains the sensor status indicator color until the display is refreshed which updates the sens...

Страница 102: ...tric shock when using or working on electrical equipment v If you do not have an ESD wrist strap just prior to removing the product from ESD packaging and installing or replacing hardware touch an unp...

Страница 103: ...ist strap on and that the ESD clip is plugged into a ground jack or connected to an unpainted metal surface If not do so now 2 Align the power supply with the bay as shown in Figure 88 on page 88 The...

Страница 104: ...an 9006 12C system Learn how to remove the service access cover from an IBM Power System LC921 9006 12C system About this task Attention For safety airflow purposes and thermal performance the service...

Страница 105: ...cover up and remove it from the system Installing the service access cover on an 9006 12C system Learn how to install the service access cover on a rack mounted IBM Power System LC921 9006 12C system...

Страница 106: ...to the service position Before you begin The systems must be removed from the rails for servicing CAUTION or or The weight of this part or unit is between 18 and 32 kg 39 7 and 70 5 lb It takes two pe...

Страница 107: ...as you remove it from the slide rails v The chassis contains most of the weight in the back side of the unit When you remove the system take care to be ready to support the weight by grasping the cha...

Страница 108: ...ce lock position Check that the rails are properly seated If the rails are not fully engaged the system could drop 5 Release the rail safety latches A by lifting them upward as shown in Figure 92 then...

Страница 109: ...o or more power supplies If the removing and replacing procedures require the power to be off then ensure that all power sources to the system are disconnected Procedure 1 Identify the system unit tha...

Страница 110: ...Figure 94 Connecting the power cords to the system 94 Power Systems Servicing the IBM Power System LC921 9006 12C...

Страница 111: ...see the adapter documentation for information on configuring the drives Sample SAS configuration v Feature code EKAA RAID adapter supporting four front mounted SATA SAS drives v Two SATA DOMs plugged...

Страница 112: ...96 Power Systems Servicing the IBM Power System LC921 9006 12C...

Страница 113: ...herefore this statement may not apply to you This information could include technical inaccuracies or typographical errors Changes are periodically made to the information herein these changes will be...

Страница 114: ...ta in sensitive or critical operations Users should periodically check IBM s support websites for updated information and fixes applicable to the system and related software Homologation statement Thi...

Страница 115: ...www ibm com able Privacy policy considerations IBM Software products including software as a service solutions Software Offerings may use cookies or other technologies to collect product usage inform...

Страница 116: ...signed to provide reasonable protection against harmful interference when the equipment is operated in a commercial environment This equipment generates uses and can radiate radio frequency energy and...

Страница 117: ...his is a Class A product based on the standard of the VCCI Council If this equipment is used in a domestic environment radio interference may occur in which case the user may be required to take corre...

Страница 118: ...lic of China Declaration This is a Class A product In a domestic environment this product may cause radio interference in which case the user may need to perform practical action Electromagnetic Inter...

Страница 119: ...ustimmung von IBM ver ndert bzw wenn Erweiterungskomponenten von Fremdherstellern ohne Empfehlung von IBM gesteckt eingebaut werden EN 55022 EN 55032 Klasse A Ger te m ssen mit folgendem Warnhinweis v...

Страница 120: ...in accordance with the instructions may cause harmful interference to radio communications However there is no guarantee that interference will not occur in a particular installation If this equipmen...

Страница 121: ...sponsibility for any failure to satisfy the protection requirements resulting from a non recommended modification of the product including the fitting of non IBM option cards European Community contac...

Страница 122: ...gliedsstaatenund h lt die Grenzwerte der EN 55022 EN 55032 Klasse B ein Um dieses sicherzustellen sind die Ger te wie in den Handb chern beschrieben zu installieren und zu betreiben Des Weiteren d rfe...

Страница 123: ...that all proprietary notices are preserved You may not distribute display or make derivative works of these publications or any portion thereof without the express consent of IBM Commercial Use You ma...

Страница 124: ...108 Power Systems Servicing the IBM Power System LC921 9006 12C...

Страница 125: ......

Страница 126: ...IBM Printed in USA...

Отзывы: