from any portion of the building and a minimum of 2 feet (61 cm) above the roof line
plus the anticipated snow line.
3.7.6 Sidewall vent termination
Caution
Vent termination clearances in this section are code minimum, or IBC-recommended
minimum requirements, and may be inadequate for your installation. Building envelope
details must be examined carefully. Take action to avoid moisture entering building
structures. Serious structural damage may occur if adequate precautions and
clearances are not considered. These precautions apply to neighboring structures as
well as to the structure the boiler(s) are installed in.
Vent terminal
Air supply inlet
Area where terminal is not permitted
Figure 19
Minimum clearances from vent/air inlet terminations (see legend on adjacent page)
29
3.7.6 Sidewall vent termination
Содержание SL SERIES
Страница 8: ...Intentionally left empty...
Страница 14: ...Intentionally left empty...
Страница 66: ...Figure 49 Electric wiring connections 62 Section Installation...
Страница 78: ...Intentionally left empty...
Страница 92: ...Intentionally left empty...
Страница 105: ...101 Appendices Wiring diagrams V 10 Controller electrical diagram Figure 52 Controller electrical diagram...
Страница 106: ...Internal wiring diagram Figure 53 Internal wiring diagram 102 Section Appendices...
Страница 107: ...Sequence of Operation Figure 54 Sequence of Operation 103 Sequence of Operation...
Страница 109: ...105 Exploded views of boiler parts...
Страница 114: ...110 Section Appendices...
Страница 118: ...Item Description Part Quantity 200 Fan Coupler 250 749 P 347 1 205 Fan Coupler O ring 150 254 1 114 Section Appendices...
Страница 122: ...Intentionally left empty...