1.
Attach the support bracket (supplied) to the
wall studs using the supplied
¼" x 2½"
long lag screws (min. 4) with ¼" flat
washers.
2.
Hook the boiler tab (located on
back of boiler) over the support
bracket flange.
3.
Ensure that the boiler tab is flush against the
mounting bracket flange.
4.
Secure the lower part of the boiler
to the wall with two field-supplied
¼" bolts.
3.5 Connecting the vent and air intake pipes
These appliances offer 3" connections that accept standard 3" PVC/CPVC pipe (3.5" OD) and 3"
nominal PPs (80 mm) pipe. Use standard vent pipe fittings to adapt to smaller diameter pipe if
appropriate . Venting must be supported in accordance with the applicable code and instructions
supplied by the manufacturers.
18
Section: Installation
Содержание SL SERIES
Страница 8: ...Intentionally left empty...
Страница 14: ...Intentionally left empty...
Страница 66: ...Figure 49 Electric wiring connections 62 Section Installation...
Страница 78: ...Intentionally left empty...
Страница 92: ...Intentionally left empty...
Страница 105: ...101 Appendices Wiring diagrams V 10 Controller electrical diagram Figure 52 Controller electrical diagram...
Страница 106: ...Internal wiring diagram Figure 53 Internal wiring diagram 102 Section Appendices...
Страница 107: ...Sequence of Operation Figure 54 Sequence of Operation 103 Sequence of Operation...
Страница 109: ...105 Exploded views of boiler parts...
Страница 114: ...110 Section Appendices...
Страница 118: ...Item Description Part Quantity 200 Fan Coupler 250 749 P 347 1 205 Fan Coupler O ring 150 254 1 114 Section Appendices...
Страница 122: ...Intentionally left empty...