The controller provides overall management of the boiler operations including:
Power-up, self-diagnostics, easy Load parameter adjustments
Burner operation, safety management systems, call-for-heat
management and load priority
Real time boiler data
Temperature and throttle operation
Maintenance of operational and error service logs
2-way communication between other IBC boilers and controls
Internet connection and communication
Operational and historical data may be accessed from the
Status
menu >
Load Status
>
Load Profiles
and
Load Statistics
screens. Also in the
Status
menu, you can view error logs, including records of all errors since
original power-up complete with the date and time of the error.
4.2 Control interface
The control interface is provided through a color touchscreen display. The touchscreen responds
to a light finger touch on the screen. You can also use a stylus, pencil, or similar device to operate
the touch controls. Do not use a sharp or metallic object such as a screw driver to operate the
control as it could damage the touchscreen.
Prior to any interaction with the touchscreen, the display shows the Home screen details of the
current boiler status. If the controller has been left on, the Home screen long enough (user
adjustable, 10 minutes by default) the display dims to save power.
The control automatically returns to the home screen if left unattended. The screens will step back
one screen at a time in 10-minute increments if the touchscreen has not been touched. The pop-
up windows will also step back automatically in 2-minute intervals.
The boiler status bar indicates if the boiler is in a normal, warning or alarm state. When no warning
or alarm state is present, the bar will be green and the time will be displayed inside the green area.
The bar can also be yellow or red corresponding a warning or alarm state. Text inside the bar will
indicate the specific warning or alarm present. If more than one alarm is present the text display
will slowly change, rotating though whatever alarms that are present.
64
Section: About the boiler controller
Содержание SL SERIES
Страница 8: ...Intentionally left empty...
Страница 14: ...Intentionally left empty...
Страница 66: ...Figure 49 Electric wiring connections 62 Section Installation...
Страница 78: ...Intentionally left empty...
Страница 92: ...Intentionally left empty...
Страница 105: ...101 Appendices Wiring diagrams V 10 Controller electrical diagram Figure 52 Controller electrical diagram...
Страница 106: ...Internal wiring diagram Figure 53 Internal wiring diagram 102 Section Appendices...
Страница 107: ...Sequence of Operation Figure 54 Sequence of Operation 103 Sequence of Operation...
Страница 109: ...105 Exploded views of boiler parts...
Страница 114: ...110 Section Appendices...
Страница 118: ...Item Description Part Quantity 200 Fan Coupler 250 749 P 347 1 205 Fan Coupler O ring 150 254 1 114 Section Appendices...
Страница 122: ...Intentionally left empty...