3.9 Installing the condensate trap
IBC’s specified vent configuration promotes the safe drainage of moisture from the boiler and
exhaust venting without flowing liquids back through the heat exchanger (as done by some other
condensing boilers).
Warning
Fill the trap with water before initially firing the boiler to prevent exhaust fumes from
entering the room. Never operate the boiler unless the trap is filled with water. Failure to
comply will result in severe personal injury or death.
Ensure the supplied trap is
correctly installed and filled with
water.
When required, add (and maintain
in good condition) a neutralization
tank. For installation information,
see
The condensate trap must be
installed on the drain connection at
the base of the boiler. The
condensate drain must be piped to
within 1 inch of a drain or
connected to a condensate pump.
The drainage line must slope
down to the drain at a pitch of ¼
inch per foot so condensate runs
towards the drain.
37
3.9 Installing the condensate trap
Содержание SL SERIES
Страница 8: ...Intentionally left empty...
Страница 14: ...Intentionally left empty...
Страница 66: ...Figure 49 Electric wiring connections 62 Section Installation...
Страница 78: ...Intentionally left empty...
Страница 92: ...Intentionally left empty...
Страница 105: ...101 Appendices Wiring diagrams V 10 Controller electrical diagram Figure 52 Controller electrical diagram...
Страница 106: ...Internal wiring diagram Figure 53 Internal wiring diagram 102 Section Appendices...
Страница 107: ...Sequence of Operation Figure 54 Sequence of Operation 103 Sequence of Operation...
Страница 109: ...105 Exploded views of boiler parts...
Страница 114: ...110 Section Appendices...
Страница 118: ...Item Description Part Quantity 200 Fan Coupler 250 749 P 347 1 205 Fan Coupler O ring 150 254 1 114 Section Appendices...
Страница 122: ...Intentionally left empty...