To perform a fuel conversion on the SL 85, 115, 160 and 199 G3 boilers:
1. Before you disconnect the electrical power, ensure that the gas supply is turned off at
the gas shut-off valve.
2. Remove the front door.
3. Undo the nut at the top of the gas valve.
4. Push down on the gas valve, and remove the orifice and O-ring.
5. Insert the fuel-appropriate orifice (from kit) into the O-ring.
6. Reinstall the orifice and O-ring.
7. Tighten the upper nut onto the gas valve.
8. Place conversion labels associated with the new fuel onto the boiler.
9. Turn on the gas supply and connect the electrical power.
10. Check for gas leaks.
11. Tune the gas valve (see "Adjusting the gas valve" below).
6.3.3 Adjusting the gas valve
Danger
Making adjustments to the IBC gas valve without a properly calibrated gas
combustion analyzer and by persons who are not trained and experienced in its use
is forbidden. Failure to use an analyzer can result in an immediate hazard.
Figure 50
Gas valve and fan components
70
Section: Boiler operation
Содержание SL SERIES
Страница 8: ...Intentionally left empty...
Страница 14: ...Intentionally left empty...
Страница 66: ...Figure 49 Electric wiring connections 62 Section Installation...
Страница 78: ...Intentionally left empty...
Страница 92: ...Intentionally left empty...
Страница 105: ...101 Appendices Wiring diagrams V 10 Controller electrical diagram Figure 52 Controller electrical diagram...
Страница 106: ...Internal wiring diagram Figure 53 Internal wiring diagram 102 Section Appendices...
Страница 107: ...Sequence of Operation Figure 54 Sequence of Operation 103 Sequence of Operation...
Страница 109: ...105 Exploded views of boiler parts...
Страница 114: ...110 Section Appendices...
Страница 118: ...Item Description Part Quantity 200 Fan Coupler 250 749 P 347 1 205 Fan Coupler O ring 150 254 1 114 Section Appendices...
Страница 122: ...Intentionally left empty...