GO-2400MC-PGE-1 | GO-2401MC-PGE-1 | User Manual (Ver. 1.0)
Preparation
- 24 -
Step 3: Verify Camera Operation
When power is supplied to the camera while the necessary equipment is connected, the
POWER/TRIG LED at the rear of the camera lights amber, and initialization of the camera starts.
When initialization is complete, the POWER/TRIG LED lights green. The ACT LED and LINK LED will
light or blink according to the network status.
Verify whether power is being supplied to the camera and whether the camera is connected to the
network by checking the rear LEDs.
For details on how to read the LEDs, see the
section.
Note:
Initialization of the camera will not complete unless it is connected to the network. If the
power / trigger LED does not switch to green within minutes of supplying power, check the LAN
cable and other connections. After initialization is completed once, the power / trigger LED will
remain green, even if the network is disconnected.
Step 4: Verify the Connection between the Camera and PC
Verify whether the camera is properly recognized via Control Tool.
1. Launch eBUS Player for JAI
eBUS Player for JAI startup screen appears.