Page 25
*)
the numbers refer to the exploded view in
the chapter with the same name.
Make connection as follows:
»
Attach cap nut with inner seal ring to
inlet screw joint on the humidifier
housing and tighten.
Do not overtighten the cap nut!
Excessive tightening will destroy the fitting.
»
Screw the other hose end cap nut
with its inner seal on a customer-
provided water tap (cap nut internal
thread is ¾“) .
»
Strainer must be placed inside the
solenoid valve
6.4 Water discharge
Risk of scalding!
During blow down, up to 0.3 l/sec (08 gal./
sec) are being drained with a temperature of
about 95 °C (203°F).
Ensure that the drain hose is reliably fas-
tened and wastewater can drain freely and
pressureless.
Humidifier installation location and wastewa-
ter discharge must be on the same pressure
level. In case of a drain connection on posi-
tive pressure, pls. consult your expert dealer.
Guidelines for water discharge composi-
tion
•
Use original HygroMatik water drain
hose
•
Do not buckle drain hose
•
Use a drain pipe and outlet pipe made
of suitable material (temperature resis-
tant up to 95°C (203°F); with waste
water cooling HyCool up to 60°C)
•
In case of a free outlet according to DIN
EN 1717, a system separator for liquid
category 4 is required for the water
connection.
•
In all other cases, use a system sepa-
rator for liquid category 5.
Water supply
1 -10 bar
(14.5 - 145 psi)
(100 x 10
3
- 100 x 10
4
Pa)
3/4” connection
SV
NOTICE
Please note
WARNING
!
Please note