Page 44
9.1
Maintenance for Operation with Demineralized
Water / Condensate
Instructions for maintenance and cleaning intervals are based
exclusively on typical, empirically determined values.
Cycle
Maintenance Task
4 Weeks after
Initial Operation
Visual check of electrical and mechanical
connections.
Visual check of water level control.
Visual check of steam cylinder interior.
Annually
Visual check of electrical and mechanical
connections.
Visual check of water level control.
Visual check of heater elements / thermo sen-
sor.
Visual inspection of interior of steam cylinder.
If needed, cleaning of steam cylinder, heater
elements and thermo sensor.
Содержание DemiLine 12
Страница 1: ...DemiLine Electric Heater Steam Humidifier For Fully Demineralized Water Manual...
Страница 29: ...Page 29 5 7 2 Drill Pattern DN40 not to scale Note Due to variable print media the dimensions are not to scale...
Страница 54: ...Page 54 10 EC Declaration of Conformity...
Страница 59: ......
Страница 60: ...Page 60 14 Exploded View...
Страница 61: ...Page 61 15 View of Cabinet...