CAST IRON SECTIONS WITH HIGH EFFICIENCY 3 DRAUGHT DESIGN
3rd Pass
( Smoke Channels)
2nd Pass
3 draught design forces the flue gas to circulate inside the body of the boiler three times before the
chimney exit, transfering all usefull energy to the water inside the sections. The optimized combustion
chamber combined with perfect heat insulation provides maximum fuel efficiency.
The combustion room of the boiler is positive pressure. Boiler is working under horizontal 3 pass
principal.
OPERATING INSTRUCTIONS
Heating System
In the system the difference between direct flow temperature and the return temperature of the water
must not be over 20 °C. The return water temperature must be over 50-55 °C. Boiler protection pump
must be used for increasing the return water temperature. The water level of the system must be measu-
red every day (if it is open system by hidrometer,if it is closed system by manometer) and water must be
added if the level is measured low. But this water addition must not be made while the system is hot. If
there are problems that cause water leakages they must be fixed as soon as possible.
Plumbing system must be made by certificated professionals, under the terms of EN standards. EN
approved materials must be used in the system.
Fuel And Electrical Connections
These connections must be made by certified profesionals under the terms of EN standards.EN approved
materials must be used in the system.
Burner,control panel, ecopanel etc. Manufacturers' or distrubutors warnings, instruction manuals must be
read .
Burner must not be started before boiler circulation starts.If circulation or protection pump has a failure
burner must be switched off. This system must work coordinarily. Turning the pumps on when the water
heat gets over 40 °C is completely wrong. Circulation pump and burner must work simultaneously.
Protection pump must be chosen properly accoridng to the capacity of the boiler.The connection of the
pump to the collectors must correctly made with valve and thermostat connection. This way,system can
stop in adjusted temperature.In any failure situation(contactor,tehermic failure,electric cut,other failures.)
when the pumps are not working ( heating and protection pumps etc..) burner must not start. Must be
switched off.System must do this automatically.
Electrical system must be made according to all above information.
22
23
1st Pass
Содержание 0M 08
Страница 1: ...Oil Gas Fired Boiler Cast iron Triple Pass Design 378 kW to 930 kW...
Страница 5: ...OM SERIES CAST IRON BOILER TECNICAL DATA I...
Страница 6: ...OM SERIES CAST IRON BOILER TECNICAL DATA II...
Страница 10: ...DIAGRAM OF A SAMPLE SINGLE BOILER HEATING CIRCUIT WITH WATER HEATER 16 OM SERIES CAST IRON BOILER...
Страница 13: ...BOILER CONTROL PANELS Standard Boiler Control Panel Single Level Standard Boiler Control Panel Dual Level 20...