HydroTherm 0M 08 Скачать руководство пользователя страница 23

CLEANING THE BOILER

Before applying mentioned services to the boiler;electric must be cut off from the main switch,fuel valves
must be closed,  control panel and the burner must be protected for avoiding any possible damage.

Smoke Channels Cleaning

Because  of  the  soot  layer  on heating surfaces,  100 °C increase on flue temperature brings out a % 5
decrease on efficiency.
By pulling   out  the M16  screws  and  stamps  on  the 4 hinges which connects door to the front section,
open the burner door. Clean the burning room, take turbulators out and clean horizontal smoke channels
(2nd  and 3rd pass). Than clean  the  turbulator and put  them in to the  channels. Close the burner door 
strictly.In this  cleaning operation soot  layer  may  occur in flue area.This soot particules can be cleaned 
by seperating horizontal smoke channels from boiler flue. After this  operation these two must be connec-
ted again and must be tested  for leakage.

The time  period for cleaning service is variable according to the fuel type of the boiler and period of use.

In boiler cleaning operation ceramic  ropes  that  isolate  front  door with front section and flue with back 
section must be controlled and must be renewed if needed.

BURNER DOOR AND BURNER CONNECTION

Burner Door

              In burner connection process there must not be any 
              empty space left  between  the  front  door and the 
              burner barell.All connection points must be covered 
              with isolation material  for avoiding any  air leakage 
              possibility.

              A metal  sheet is used for  easier  assembling  of the 
              burner  to the door. This metal  sheet is made of  12 
              mm thickness and in the dimensions of 240x240 mm
              (1).

              The isolation of the burner door is made of a special 
              thermal ceramic which is durable  up to 1250ºC and 
              has no  defections on human  health (2). Please  be  
              sure that this isolation plate is carried  carefully and
              intensivly during transportation.

              There is a ceramic  rope fit in to the channels of iso-
              lation door.This prevents leakages between isolation
              door and front section of the  boiler.  After repairing  

 

              or  cleaning  service the  doors  connection with the 
              front  section must be done properly,strictly.

              OM series boilers doors are available  for opening to 
              both  sides. This  brings  advantages of  assembling,
              reparing and other operations.

              A tempered ceramic glass is placed on to the burner 
              door for watching flame inside (3).

35

36

2

1

3

1

45º

Содержание 0M 08

Страница 1: ...Oil Gas Fired Boiler Cast iron Triple Pass Design 378 kW to 930 kW...

Страница 2: ...G 34 CLEANING THE BOILER 35 BURNER DOOR AND BURNER CONNECTION 36 BURNER CONNECTION FLANGE SIZES 37 INTRODUCTION In this manual you will find the instructions for three pass cast iron boilers suitable...

Страница 3: ...Starting and first operation of the boiler must be made by authorized technicians The periodical controls of the boiler and the burner must be done If not the boiler can lose efficiency and the fuel...

Страница 4: ...r the burner from your supplier Please be sure that the front door burner door for the boiler is strictly closed and burner connections are properly made as the boiler is working GENERAL CHARACTERISTI...

Страница 5: ...OM SERIES CAST IRON BOILER TECNICAL DATA I...

Страница 6: ...OM SERIES CAST IRON BOILER TECNICAL DATA II...

Страница 7: ...OM SERIES CAST IRON BOILER DIMENSIONS BOILER ROOM SETTINGS AND BOILER PLATFORM DIMENSIONS 11 A W B C D E...

Страница 8: ...ary This will prevent chalk and dust and the life of the ssytem will be long The water in the radiator or heating system is not healthy Do not use this water as drinking or cleaning water Do not take...

Страница 9: ...cel the related standards requirements The Meanings Of The Shortenings In Diagram KSD Bo ler Water Heat Sense Element KGS Boiler Leaving Water KDS Boiler Return Water ID Heating Cell KKPD Boiler Prote...

Страница 10: ...DIAGRAM OF A SAMPLE SINGLE BOILER HEATING CIRCUIT WITH WATER HEATER 16 OM SERIES CAST IRON BOILER...

Страница 11: ...Volume resistance m h mbar m h mbar OM 06 325 000 377 9 21 67 102 16 25 54 OM 07 385 000 447 7 25 67 147 19 25 80 OM 08 435 000 505 8 29 00 180 21 75 105 OM 09 485 000 564 0 32 33 160 24 25 78 OM 10 5...

Страница 12: ...on pipes must be isolated Fuel tank must be positioned in higher level than the burner the height difference between the burner and fuel tank H must be more than 4 m In the seasons that the boiler is...

Страница 13: ...BOILER CONTROL PANELS Standard Boiler Control Panel Single Level Standard Boiler Control Panel Dual Level 20...

Страница 14: ...AGRAMS Standard Boiler Control Panel Single Level Electric Diagram Electric feedings is 220 V 50 Hz Monophase Standard Boiler Control Panel Dual Level Electric Diagram Electric feedings is 220 V 50 Hz...

Страница 15: ...be fixed as soon as possible Plumbing system must be made by certificated professionals under the terms of EN standards EN approved materials must be used in the system Fuel And Electrical Connections...

Страница 16: ...must be taken from every radiator Water must be in quality which mentioned on Page 12 plumbing instructions Boiler must not be filled up with water when it is hot This can cause cracks in sections INS...

Страница 17: ...OM SERIE CAST IRON BODY BOILER CABIN PARTS LIST Safety valve and expansion tank must be connected directly to the boiler and the place of use without using any valve between 25 IMPORTANT...

Страница 18: ...26 0 30 1 20 2 70 3 30 3 90 4 50 2 10 100 200 300 400 500 600 800 700 100 130 180 200 220 160 10 20 30 40 50 60 80 70 90 100 900 5 10 5 70...

Страница 19: ...ater line must be arranged near the boiler And for filling out the water of the boiler in necesarry conditions there must be a connection to drainage in the system If there are any electric keys cable...

Страница 20: ...ems or failure boiler must not be started Water level of the boiler must be controlled Water must be added to the boiler if the water level is low Please call technicians if there is a water leakage L...

Страница 21: ...fety thermostate switch after the boiler is cold enough Burner must start If the boiler doesn t start or if the safety thermostat stop the boiler again please call technical services If the burner saf...

Страница 22: ...oof of the connections of the boiler test Valves tests for proper opening and closing Fuel filter test cleaning if needed Sensor of the burner liquids tests Cleaning or renewing If needed Working and...

Страница 23: ...that isolate front door with front section and flue with back section must be controlled and must be renewed if needed BURNER DOOR AND BURNER CONNECTION Burner Door In burner connection process there...

Страница 24: ...ect proper burner must be chosen according to gas to gas side resistance valu es of the boiler Our company is not responsible for any possible problem if not certificated or out of standard burner is...

Отзывы: