![HydroTherm 0M 08 Скачать руководство пользователя страница 22](http://html1.mh-extra.com/html/hydrotherm/0m-08/0m-08_installation-operation-and-maintanance-manual_2192551022.webp)
Situation and the leakproof of the sections and rope isolations controls.
Working pressure test for burning adjustmenst with the flue gas measurement system if needed.
Sensors and connection of the sensors test.
Boiler burning room and possible soot layers on smoke channels are checks and cleanings.
Connection and the leakproof of the boilers doors test.
Leakproof of the connections of the boiler test.
Valves tests for proper opening and closing.
Fuel filter test. cleaning if needed.
Sensor of the burner liquids tests.Cleaning or renewing If needed .
Working and safety controls of burner and the boiler.
PACKING
Burner Box
(pallet and Cardboardbox)
Boiler Cabin Sheet Parts and
insulating jacket
Cast Iron Boilers Elements
(wooden box)
(80x120 Pallet)
(1 or 2 pallet.According to boiler type)
Mounting Parts box (1 or 2 according to boiler type)
Control Panel box
(Nipels,screw,nuts,washer,o-ring,etc.)
(Cardboard Box)
(Cardboard Box)
34
Содержание 0M 08
Страница 1: ...Oil Gas Fired Boiler Cast iron Triple Pass Design 378 kW to 930 kW...
Страница 5: ...OM SERIES CAST IRON BOILER TECNICAL DATA I...
Страница 6: ...OM SERIES CAST IRON BOILER TECNICAL DATA II...
Страница 10: ...DIAGRAM OF A SAMPLE SINGLE BOILER HEATING CIRCUIT WITH WATER HEATER 16 OM SERIES CAST IRON BOILER...
Страница 13: ...BOILER CONTROL PANELS Standard Boiler Control Panel Single Level Standard Boiler Control Panel Dual Level 20...