Page 8
Hydro Systems Co. 2018
5.4.1.
Eductors run from left to right in the following order:
In 4 Product units (Single cabinet)
•
F (Flush) 1, 2, 3, 4
In 6 product units (Single cabinet)
•
F (Flush) 1, 2, 3, 4, 5, 6
In 8 Product units (Twin cabinet)
•
F (Flush) 1, 2, 3, 4, 5, 6, 7, 8
Note:
Flush - Do not connect any tube to this position.
5.4.2.
Measure the distance from the Eductor to the base of the chemical container.
5.4.3.
Cut the 12.7mm (½’’) or 13mm ID Flexible PVC Hose tube to length.
Note:
Alternative hose options are available. Contact Hydro Systems for further information.
5.4.4.
Push the PVC hose on to the detached check valve and secure with cable tie, then push the elbow into the eductor
and secure with the clip, as shown in the diagram on the next page.
Check Valves
Note:
The check valves are supplied detached in a bag with the unit. To prevent damage, do not install hoses to the check
valve while connected to the manifold.
5.4 Installation Step 4: Routing Pickup Tubes
Содержание EvoClean 1214GB
Страница 20: ...Page 20 Hydro Systems Co 2018 7 4 Setup Screen ...
Страница 21: ...Page 21 ...
Страница 24: ...Page 24 Hydro Systems Co 2018 ref 2 detail ...