Page 5
Hydro Systems Co. 2018
4. site survey and installation requirements
•
Unit is to be installed by a trained technician; all local and national electrical and water regulations are to be
observed.
•
Unit must not be installed near areas that suffer excess temperature changes, direct sunlight, frost or moisture of
any kind.
•
Area must be free of high levels of electrical noise.
•
Ensure the unit can be mounted in an accessible position above the height of the required discharge location.
CAUTION
Before an installation takes place it is advisable to complete a site survey to ensure the EvoClean can be installed
in a position that meets all of the requirements listed below.
•
Unit must be mounted on a suitable wall, that is flat and perpendicular to the floor.
•
The unit location should be well lit for any maintenance and free of high levels of dust / air particulates.
•
Scheduled maintenance should be carried out on the dispenser at least once per year.
•
It is a legal requirement if the EvoClean is supplied from the water mains, that a backflow device offering protection
equal or higher than the products being dispensed to prevent back siphoning of non-potable water into the water
mains. If used, hose sets used to connect the EvoClean to the mains water supply must also be compliant with
IEC 61770.
WARNING
Ensure the incoming water supply hose is supported to prevent unnecessary stress on the inlet
fitting.
1. Connect incoming water supply using fittings provided. This will either be a 3/4” female Garden Hose fitting, or a
1/2” O.D.
2. A locally approved back-flow prevention device (not provided) may be required for sale and legal operation.
Содержание EvoClean 1214GB
Страница 20: ...Page 20 Hydro Systems Co 2018 7 4 Setup Screen ...
Страница 21: ...Page 21 ...
Страница 24: ...Page 24 Hydro Systems Co 2018 ref 2 detail ...