![Hydro Bio-Science Quattro-DB Скачать руководство пользователя страница 21](http://html.mh-extra.com/html/hydro-bio-science/quattro-db/quattro-db_assembly-and-operation-instructions-manual_2191818021.webp)
Page 21
5.5.3.
Locate the Support post bottom end cap, the (3) 1/4-in. X 3-in. hex head
bolts, nuts and 6 washers. The end cap will be used to set Solar Panel
South-facing orientation. (
Figures 5-10
–
5-12)
5.5.4.
Set the Support post end cap down over the J-Bolt. Using a compass and
the
Magnetic Declination Calculator
determine True
North for your location. Rotate the end cap until sighting through the
open sides, the cap lines up on the True North/South line.
(Figure 5-11)
Once you are satisfied the end cap is properly lined up, tighten the nut on
the J-Bolt securing the end cap in place.
(Figure 5-12)
(*Magnetic Declination Calculator
–
https://www.ngdc.noaa.gov/geomag-web/
End cap bolts onto concrete
pad and sets Solar Panel
Orientation.
Drill 8 mounting holes. Sweep away dust
before replacing post.
Figure 5-12
Rotate End Cap until open sides are lined up
on the True North/South line. Solar panel
faces south and battery box faces north.
Figure 5-11
North
Establish line for True
North/South Orientation
Figure 5-10