FluidControl Unit - FCU 1000 Series
HYDAC Filtertechnik GmbH
en
Page 24
BeWa_FCU1000_3371346a_en.doc
2007-12-04
Make sure to follow the sequence specified here:Make sure to follow the sequence specified
here:
1. First connect the open end of the OUTLET
return hose (color: clear-transparent) to the
system reservoir or to a waste oil canister.
2. Now connect the other end of the hose to the
OUTLET port of the FCU.
OUTLET
3. Check the pressure at the measurement
point. It has to be within the permissible
range.
4. Screw the high pressure adaptor (A) onto the
INLET port of the FCU.
5. Connect the high pressure hose (color: black)
to the high pressure adaptor (A).
6. Connect the other end of the high pressure
hose to the measurement point of the
system.
45 … 345 bar
A
INLET
7. The hydraulic installation of the FCU is now
complete.