FluidControl Unit - FCU 1000 Series
HYDAC Filtertechnik GmbH
en
Page 25
BeWa_FCU1000_3371346a_en.doc
2007-12-04
6.2.3
Selecting the measurement point
The measurement point has to be selected so that the measured volume is taken from
a turbulent flow area, i.e. a pipe bend. This ensures that a typical sample is analyzed.
The FCU should be installed in the vicinity of the measurement point in order to prevent
sedimentation (formation of particle deposits) in the line and to attain precisely timed
results.
While installing the INLET hose, make sure that no "siphon trap" is created. The
original INLET high pressure hose may not be extended.
3
H
L
2
INLET
Mainflow
Mainflow
H
Mainflow
Mainflow
L
1
2
INLET