3.7 M
aCHine
seTUp
Foundation
• Capacity of the subsoil around 680 kg / m²
• Threaded hole for screws
• Hole for anchor bolts
Machine set up
• Router table must be horizontal in the longitudinal and the cross slide direction.
• Measuring with a spirit level.
Method A
• The adjusting screws are set to the levelers sets; Aligning with the adjusting screws.
• The Levelers are vibration-damping and noise-reducing properties.
• An additional low-bolts of the machine is not necessary.
Required accessories:
• 4 pcs. Longer Levelers,
• 4 pcs Hex Nut (Alloy material)
Method B
Put down 4 pcs of leveling pads with the steel bolts M20 x 80mm L (DIN 529 Machine screwdown)
3.8 e
leCTriCal
ConneCTion
WARNING: All electrical connections must be made by a qualified electrician!
Failure to comply may cause serious injury!
The UM 320 universal milling machine is rated at 400V, 3Ph ONLY.
• Required cable: 4-pole (PE, L1, L2, L3) ; Fuse: 16 A
• Confirm power at the site matches power requirements of the mill before connecting to the power source.
• Cannot change the voltage from junction box cover on the motor and the wires according to the diagram found
on the inside of the cover.
• Before hooking up to the power source, make sure that the switch is in the OFF position.
• The mill must be properly grounded.
• Check for proper spindle rotation in the high-speed range. The spindle should rotate clockwise when viewed
from the top of the machine. If the spindle rotates counter-clockwise, then there are
• two phases e.g. L1 with L2 inverted on the terminal block to terminals.
Safety regulations: Beforere connecting the phases,to making sure the supply cable tension!
Содержание HU 320 UM TOPLINE
Страница 1: ...HU 320 UM TOPLINE M I L L I N G M A C H I N E...
Страница 7: ...7 CHANGES AND TYPING ERRORS RESERVED 3 6 Overall dimentions 1 8 Overall Dimensions 9...
Страница 10: ...10 CHANGES AND TYPING ERRORS RESERVED 13...
Страница 56: ...56 CHANGES AND TYPING ERRORS RESERVED 6 28 Operate Panel Assembly Operate Panel Assembly 30...
Страница 60: ...60 CHANGES AND TYPING ERRORS RESERVED 6 30 Wire Diagram Wire Diagram 34...
Страница 61: ...61 CHANGES AND TYPING ERRORS RESERVED...
Страница 64: ...2017 V1...