32
2 Connection coolant hose
3 mounting box
1 Vice with hand wheel
2. moving forward guide with protective
3. Clamping screw front
4.Screw band voltage
5. Control panel with emergency stop switch
6. feed regulator
7. Average initial recognition
1
2.1 cooling lubrication
Cutting oil and water in the proportion 1:10, 1:15, or in accordance with the
Manufacturer's instructions of the product mix carefully (the container Liters).
Pour the cooling water in the rear tank.
Check real-tightness of the coolant pump and the cooling medium holder same
12.2 Power supply
It is important to ensure that the voltage and line frequency on the
Nameplate information listed correspond (on the side of the control panel).
Deviations above 10% lead to more or less distinct Irregularities in operation.
The supplied connector to a suitable power outlet (if this needs to be replaced, this
work must by authorized personnel e.g. Be performed electrician). Carried out by
Содержание HU 300 HAC-4 Topline
Страница 1: ...HU 300 HAC 4 Topline METAL CUTTING BAND SAW MACHINE INSTRUCTION MANUAL 0...
Страница 5: ...4 A GENERAL Indentation MODEL HU 300 HAC 4 TOPLINE...
Страница 52: ...51 Overview Lubricant...
Страница 60: ......
Страница 61: ......
Страница 62: ......
Страница 63: ......
Страница 64: ......
Страница 65: ......
Страница 66: ......
Страница 67: ......
Страница 68: ......
Страница 69: ......
Страница 70: ......
Страница 71: ...69...
Страница 72: ...78...
Страница 73: ...77...
Страница 74: ...76...
Страница 75: ...75...
Страница 76: ...74...
Страница 77: ...73...
Страница 78: ...72...
Страница 79: ...71...
Страница 80: ...70...
Страница 85: ...CHANGES AND TYPING ERRORS RESERVED...
Страница 86: ...24 CHANGES AND TYPING ERRORS RESERVED 2018 V1...