![Hussmann Smart Exchange Скачать руководство пользователя страница 5](http://html1.mh-extra.com/html/hussmann/smart-exchange/smart-exchange_installation-and-operation-manual_2189330005.webp)
HUSSMANN CORPORATION • BRIDGETON, MO 63044-2483 U.S.A.
P/N 3110238_B
v
Smart Exchange Food Lockers
TABLE OF CONTENTS
SAFETY
Before you Begin (Definitions of Terminology)
ii
PPE & Safety Statements
iii
Purchase & Warranty Message
vi
Environmental Concerns / Safety
vi
INSTALLATION
Special Installation Requirements
1-1
UL Listing
1-2
Fed/State Regulation
1-2
Serial Plate Location
1-2
Product Temperature
1-2
QR Code
1-2
Refrigerated Module Naming Convention
1-3
Site Preparation
1-4
Shipping Damage
1-5
Shipping Skid
1-5
Unloading from Truck/Trailer
1-5
Unloading Indoor Refrigerated Modules
1-5
Refrigerated Module Leveling
1-6
MECHANICAL INSTALLATION
Fit & Secure Refrigerated Modules Together
1-7
Install Concrete Wedge Anchor
1-8
Installing Canopy Frame Assembly
1-9
Joining Canopy Modules Together
1-10
Install Refrigerated Module Splashguards
1-11
Installing Control Kiosk Splashguards
1-11
Install End Splashguard Close-off
1-12
Install Joint Trim
1-12
FIELD CONNECTIONS
Electrical
2-1
Filed Wiring
2-1
Main Disconnect Switch
2-1
Ethernet
2-1
Electrical Wiring Routes
2-2
LED Light Channel Installation
2-3
Installing Lighting
2-4
Security Camera Installation
2-5
Refrigeration Startup
2-7
Installing Top Panels and Water Tray(s)
2-8
Control Kiosk Field Connections
2-9
ELECTRONIC CONTROLLER
Electronic Controller
3-2
Internal Web Server
3-2
Data Logging
3-2
Factory Restore
3-2
Standalone Operation
3-2
Connecting to CoreLink (Wireless)
3-3
Direct Wired Connection
3-6
Connecting to CoreLink-(Wired)
3-7
Connecting to CoreLink-(Store Network)
3-9
Fixing Common Connection Issues
3-10
REFRIGERATION
Refrigeration
4-1
Condensing Unit Access
4-1
Sequence of Operation
4-2
Defrost
4-2
Low Ambient Heating Mode
4-2
Evaporator Fans
4-3
Condenser and Winter Holdback
4-3
Heaters
4-3
Additional Safeties
4-4
Compressor Safeties
4-4
Startup Check List
4-5
Starting Refigerated Modules
4-6
12-Hours after Startup Checklist
4-6
Startup & Operation
4-6
Stocking
4-7
Maximum Locker Volumes
4-7
Waste Outlet and Water Seal
4-7
Installing FDA/NSF Required Thermometer
4-7
USING THE LOCKERS
Add/Remove Users
5-1
Placing Orders
5-1
Locker Reservation Process
5-3
MAINTENANCE
Back Panel Access
6-1
Care & Cleaning
6-1
Cleaning Stainless Steel Surfaces
6-2
Cleaning Coils
6-2
Cleaning Condensate Catch Pan
6-2
SERVICE
Locker Assembly Component Access (Outdoor)
7-1
Locker Assembly Component Access (Indoor)
7-3
Replacing Fan Motors and Blades
7-4
Replacing Heaters
7-4
Replacing Door Gaskets
7-5
APPENDIX - (CORELINK FACTORY SETPOINTS)
WARRANTY
Содержание Smart Exchange
Страница 48: ...P N 3110238_B U S Canada 1 800 922 1919 Mexico 01 800 890 2900 www hussmann com 4 8 NOTES...
Страница 56: ...P N 3110238_B U S Canada 1 800 922 1919 Mexico 01 800 890 2900 www hussmann com 5 8...
Страница 58: ...P N 3110238_B U S Canada 1 800 922 1919 Mexico 01 800 890 2900 www hussmann com 5 10 NOTES...
Страница 68: ...P N 3110238_B 8 4 APPENDIX Sensor Resistance Pressure Sensor SENSOR REISTANCE AND PRESSURE...