Installation (cont.)
Plumbing
WASTE OUTLET AND P-TRAP
The waste outlet is located off the center of the case on
one side allowing drip piping to be run lengthwise under
the fixture.
A 1-1/2" P-trap and threaded adapter are supplied with
each fixture. The P-trap must be installed to prevent air
leakage and insect entrance into the fixture.
NOTE: PVC-DWV solvent cement is recommended.
Follow the Hussmann’s instructions.
INSTALLING CONDENSATE DRAIN
Poorly or improperly installed condensate drains can
seriously interfere with the operation of this refrigerator,
and result in costly maintenance and product losses. Please
follow the recommendations listed below when installing
condensate drains to insure a proper installation:
1. Never use pipe for condensate drains smaller than the
nominal diameter of the pipe or P-trap supplied with
the case.
2. When connecting condensate drains, the P-trap must
be used as part of the condensate drain to prevent air
leakage or insect entrance. Store plumbing system
floor drains should be at least 14" off the center of the
case to allow use of the P-trap pipe section. Never use
two water seals in series in any one line. Double P-
traps in series will cause a lock and prevent draining.
3. Always provide as much down hill slope (“fall”) as
possible; 1/8" per foot is the preferred minimum. PVC
pipe, when used, must be supported to maintain the
1/8" pitch and to prevent warping.
4. Avoid long runs of condensate drains. Long runs make
it impossible to provide the “fall” necessary for good
drainage.
5. Provide a suitable air break between the flood rim of
the floor drain and outlet of condensate drain. 1" is
ideal.
6. Prevent condensate drains from freezing:
a. Do not install condensate drains in contact with
non-insulated suction lines. Suction lines should be
insulated with a nonabsorbent insulation material
such as Armstrong’s Armaflex.
b. Where condensate drains are located in dead air
spaces (between refrigerators or between a
refrigerator and a wall), provide means to prevent
freezing. The water seal should be insulated to
prevent condensation.
ARM STRUT
GUSSET
WEDGE BRACKET
Corner wedges are attached via front and rear camlocks.
Use a 7mm Allen wrench to turn the locks. Do not
overtighten! Join the top by using a joint bracket (included
in joint kit) with 3/8" bolts.