18 ENGINE
Preparatory work
-
Check the transmission. (
llill
p. 205)
-
Carefully lubricate all parts before assembling.
Main work
306577-11
-
Secure the countershaft in the bench vise with the toothed end facing downward.
Guideline
I
Use soft jaws.
-
Mount needle bearing
O
and second-gear idler gear @ onto the countershaft with the protruding collar
facing downward.
-
Mount stop disk@) and lock ring
C,.
-
Mount the sixth-gear sliding gear
0
with the shift groove facing up.
-
Mount lock ring
(D
and stop disk@.
-
Mount needle bearing
(D
and the fourth-gear idler gear
@)
with the collar facing up.
-
Mount needle bearing «i) and the third-gear idler gear
48
with the collar facing down.
-
Mount stop disk
48
and lock ring 41).
-
Mount the fifth-gear sliding gear
e
with the shift groove facing down and stop disk
48.
-
Mount needle bearing Ci), first-gear idler gear
48
with the recess facing down, and stop disk
4D.
-
Finally, check all the gear wheels for smooth operation.
208
..
Содержание F2103P4
Страница 1: ...PIONEERING SINCE 1903 REPAIR MANUAL2016 FE 250 Art no 3403024en Husqvarna MOTORCYCLES ...
Страница 2: ......