1.3
Servicing Protocol
1.3.1
General Service - Pump
Initial Assessment (Visual Check):
a)
Enclosure for integrity and cleanliness of top and base
b)
Fittings for damage and security
c)
Labels are secure and legible
Open Pump:
d)
Wiring and terminations are secure
e)
Tubing security and integrity
f)
Components fastenings are secure
g)
General condition inside is clean
Open Compressor:
h)
Silencer bag weld seams
i)
Bellows/armature blade assembly condition
General:
j)
Check electric cord assembly for security
k)
Clean condition of pump.
If any items in a) - j) appear defective, replace with appropriate spare part and
record action on service record sheet.
Re-assemble pump unit completely.
1.3.2
Testing
The following procedures should be carried out following any repair and as part
of the routine service.
Perform electrical safety checks, pressure, flow and calibration checks and
functional checks as given in Section 5.
Note:
It is important to ensure that all tools which are used in servicing are
kept in good condition and test rigs for flow and pressure are regularly
calibrated to a reference gauge with calibration directly traceable to
the appropriate National Standards.
F048
1-3
Issue 3
Mar 2003
Содержание Flowtron DVT
Страница 1: ...F048 Issue 3 Mar 2003 Huntleigh HEALTHCARE Flowtron DVT Service Manual ...
Страница 2: ...F048 Issue 3 Mar 2003 ...
Страница 6: ...Issue 3 iv F048 Mar 2003 ...
Страница 10: ...F048 1 4 Issue 3 Mar 2003 ...
Страница 12: ...F048 2 2 Issue 3 Mar 2003 ...
Страница 16: ...F048 3 4 Issue 3 Mar 2003 ...
Страница 18: ...F048 4 2 Issue 3 Mar 2003 ...
Страница 30: ...F048 5 12 Issue 3 Mar 2003 ...
Страница 32: ...F048 6 2 Issue 3 Mar 2003 ...
Страница 33: ...WIRING DIAGRAMS F048 1 1 Issue 3 Mar 2003 Flowtron DVT AC 500 ...
Страница 34: ...F048 1 2 Issue 3 Mar 2003 ...
Страница 37: ...F048 Issue 3 Mar 2003 ...