©
2011 by Huchez Treuils S.A.S.
Translation of the original instructions
25
EN
Reproduction prohibited
C -
Limit switch adjustment.
Up
Down
1) Lift the load to the top point and identify the lever (A or B) that is
nearest the stop (S).
2) Push this lever (A or B) onto the stop (S)
3) Lower the load to the bottom point.
4) Push the second lever onto the stop (S)
1) Lift the load up to the highest required limit and find the lever
moving towards the finger stop.
2) Place this lever (A or B) on the finger stop to fix the top limit
switch.
3) Lower the load down to its lower level.
4) Place the second lever A or B on the finger stop to fix the bottom
limit switch