UPS5000-E-(25 kVA-75 kVA)-SM
User Manual (Half Height)
3 Installation
Issue 03 (2019-12-13)
Copyright © Huawei Technologies Co., Ltd.
50
Knock the expansion bolts into the holes until the expansion tube completely fits into the hole.
The expansion tube must be completely buried under the ground to facilitate subsequent
installation.
Figure 3-9
Installing an expansion bolt (unit: mm)
1.
Drill a hole in the concrete floor using a hammer drill. The hole depth should range from
52 mm to 60 mm.
2.
Slightly tighten the expansion bolt and vertically insert it into the hole. Knock the
expansion bolt using a rubber mallet until the expansion sleeve is fully inserted into the
hole.
3.
Partially tighten the expansion bolt.
4.
Remove the bolt, spring washer, and flat washer.
Step 3
Move the UPS to the installation position over its castors.
Step 4
Lower the four leveling feet at the bottom of the UPS using a wrench until all the four castors
at the bottom hang in the air and the leveling feet bear the whole cabinet weight, as shown in
Step 5
Secure the two L-shaped brackets to the front and rear of the chassis using eight M6 screws.