Step 4
Connect power cables to the server and power on the server. Connect a network cable, a VGA
cable, or USB devices as required.
----End
4.4.2 Installing with Adjustable Guide Rails
Adjustable guide rails are for a cabinet with a depth of 543.5 mm to 848.5 mm (21.40 in. to
33.41 in.) between the front and rear mounting bars.
The TaiShan 2280 V2 servers are stackable onto adjustable guide rails.
Step 1
Install the adjustable guide rails.
1.
Position a guide rail horizontally in contact with the mounting bars and hook it onto the
cabinet. See (1) in
.
NOTE
The three holes in each mounting ear of a guide rail should be within 1U boundary lines.
Figure 4-6
Installing an adjustable guide rail
2.
Plug the second square holes at the front and rear of the guide rail using the plugs
included to secure the guide rail. See (2) in
.
3.
(Optional) Install an M6 screw in the square hole underneath at the rear of the guide rail
and secure it. See (3) in
.
NOTE
While screws are not necessary for the installation of adjustable guide rails, M6 screws at the rear
end of the server will make it more shockproof and secure.
4.
Install the other guide rail in the same way.
Step 2
Install the server.